Similar Projects
New Addition and Renovations of Southern Alamance High School
Renovation, Addition - 27,525 SF
Construction
Less than $20,661,931 est. value
Graham, NC 27253

ABSS New High School
New Construction - 221,000 SF
Construction
NC

Hawbridge Upper School
New Construction - 41,400 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saxapahaw, NC 27340

Cummings High School Addition and Renovations
Renovation, Addition - 1,768 SF
Construction
Less than $8,500,000 est. value
Burlington, NC 27217

Graham High School Renovations
New Construction, Renovation - 1,400 SF
Construction
Graham, NC

Eastern Alamance High School - Additions and Renovations
Renovation, Addition - 6,527 SF
Construction
Less than $9,500,000 est. value
Mebane, NC 27302

Western Alamance High School - Additions and Renovations
Renovation, Addition - 13,691 SF
Construction
$7,077,000 est. value
Elon, NC 27244

Walter M. Williams High School Bond Project
New Construction
Post-Bid
Burlington, NC 27215

Installation of ADA Compliant Curb Ramps
Results

11Th Street Apartments
New Construction
Design
Mebane, NC

2021 Security Vestibules
Renovation, Infrastructure
Results
Burlington, NC 27217

2021 Security Vestibules
Renovation, Infrastructure
Results
Burlington, NC 27217

Elevated Walkway Repairs - Building A, B and Main
Infrastructure
Results
$75,000 to $125,000 est. value
Haw River, NC 27258

CDBG Melrose-Chandler-Apple Street Sidewalk Improvements
Infrastructure
Post-Bid
Burlington, NC 27217

CDBG Ruby Lane Walking Trail Connection
Infrastructure
Post-Bid
Burlington, NC

Reported 03/23/2022 12:00 AM
Project Title

2022 Security Vestibules

Physical Address View project details and contacts
City, State (County) Graham, Haw River, NC 27253   (Alamance County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect - 02/24/22
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes renovations for security vestibules at five schools. They are as follows: Graham Middle, South Graham Elementary, North Graham Elementary, Haw River Elementary, and Ray Street Complex. The scope of work for the project is as follows: 1. Renovations: Renovations consist of creating security vestibules and front office upgrades with ADA improvements. 2. The projects are located at the following addresses: Graham Middle School - 311 East Pine Street, Graham, NC 27253 - South Graham Elementary - 320 Ivey Road, Graham, NC 27253 - North Graham Elementary School - 1025 Trollinger Road, Graham, NC 27253 Haw River Elementary School - 701 East Main St., Haw River, NC 27258 Ray Street Complex - 609 Ray Street, Graham, NC 27253.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents