Similar Projects
Boiler Replacement
Alteration
Bidding
Greensboro, NC

Page Hall Mechanical and Electrical Upgrade
Alteration
Bidding
$8,200,000 est. value
Raleigh, NC 27607

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

Reverse Osmosis System for 30 Locations
Post-Bid
NC

Z--Demo and Install Mechanical Room
Results
$25,000 to $100,000 est. value
Salisbury, NC 28144

Design, Installation and Maintenance of Carbon POE Systems on Residential Wells
Term Contract
Results
$100,000 est. value
Raleigh, NC

Removal and Installation of Cooler/Freezer Units at Two (2) Sites
Post-Bid
Newton, NC 28658

CATS Annual Boiler Maintenance and Repair Services
Term Contract
Results
Charlotte, NC

Mechanical Repairs Bldg RR400 (18-0041)
Post-Bid
$1,000,000 to $5,000,000 est. value
Camp Lejeune, NC 28547

Steam Plant Boiler Controls Replacement
Results
$437,185 est. value
Greensboro, NC 27403

OWASA Mason Farm Miscellaneous Mechanical Improvements
Post-Bid
$350,000 est. value
Chapel Hill, NC 27517

Water Heater
Results
Less than $10,702 est. value
Raleigh, NC 27603

Infrared Heater Installation for Solid Waste
Post-Bid
NC

Water Heater Replacement at the Boxing Center Due to Hurricane Florence
Results
Wilmington, NC 28402

Boiler Plant Repairs
Post-Bid
Elizabeth City, NC 27909

Last Updated 08/12/2021 08:41 AM
Project Title

Steam Repairs Phase VIIIC

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27695   (Wake County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will complete upgrades to the steam and condensate piping in the North Campus walkable steam tunnel, trench and mechanical rooms of DH Hill Library. The current piping is sized for 30 psi, and the University is moving to install 150 psi steam pipe throughout the entire campus. Removing 30 psi steam from the tunnel removes steam pressure reducing stations from the tunnel as well as reduces distribution pipe size. The scope includes asbestos abatement of all insulation around existing steam pipe; removal of the 30 psi steam pipe and associated condensate pipe; relocation of the existing Pressure Reducing Valve (PRV) station in the tunnel; excavation of the area over the trench located south of the Atrium; installation of new 150 psi steam pipe and condensate pipe in the trench and the service hallways and mechanical rooms for the DH Hill Library; installation of new structural supports including anchors and guides for the steam and condensate lines; installation of new insulation around the new 150 psi steam pipe; building and installation of new PRV stations in the mechanical rooms to convert the incoming 150 psi steam to 30 psi steam so that the steam is at a level suitable for the existing building equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 33 - Utilities, Schedules for Utilities, Schedules for Hydronic and Steam Energy Utilities.
Division 40 - Process Integration, Steam Process Piping, Intermediate-Pressure Steam Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents