Similar Projects
Building 226 HVAC Replacement - Construction, Fort Leavenworth
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Fort Leavenworth, KS 66027

City Hall HVAC Upgrades (Rebid)
Renovation
Sub-Bidding
$104,685 CJ est. value
Leavenworth, KS 66048

Headworks Make-Up Air Unit Replacement HVAC Improvements
Post-Bid
McPherson, KS

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Roberts Building HVAC Replacement
Results
$439,994 est. value
Olathe, KS 66061

Chem-BioChem Building Fume Hood Upgrades- Phase 1
Results
$1,380,000 est. value
Manhattan, KS

Bus Barn HVAC Improvements
Renovation
Sub-Bidding
$300,000 CJ est. value
Dodge City, KS 67801

Preventative Service Maintenance and Inspection of Commercial Chillers, Boilers and Pumps
Term Contract, Alteration
Post-Bid
Wichita, KS

Replacement of HVAC Equipment at the East Lawrence Recreations Center, Kaw River Waste Water Treatment Plant and Fire Medical Station 2
Alteration
Results
Lawrence, KS

HVAC Esser Phase I
Renovation
Sub-Bidding
$300,000 CJ est. value
Lawrence, KS 66044

Air Conditioning and Furnace Filters
Alteration
Post-Bid
Wichita, KS

Ottawa HS Chiller Replacement
Alteration
Results
Ottawa, KS 66067

Tice Hall MTC Building 1951 HVAC Replacement
Renovation
Sub-Bidding
$250,000 CJ est. value
Fort Leavenworth, KS 66027

Heating, Ventilation, and Air Conditioning - HVAC On-Call Services
Alteration
Post-Bid
Wichita, KS

Replacement of Vav Boxes in Administration Building Phase II
Alteration
Results
Less than $128,000 est. value
KS

Last Updated 08/30/2022 02:32 AM
Project Title

Repalce CRAC Unit #2 at Building 54

Physical Address View project details and contacts
City, State (County) McConnell AFB, KS 67221   (Sedgwick County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $222,935 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Aug 26, 2022 Contract Award Number: W50S7X-22-C-0002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JUQ9BXSQ61J8 Contractor Awarded Name: SOUTHTOWN GLASS INC Contractor Awarded Address: Liberty, MO 64068-1397 USA Base and All Options Value (Total Contract Value): $222935.00 Work shall consist of but is not limited to the following: Task 1: Replace and reroute a portion of the existing copper refrigerant line sets on two existing 30 Ton Liebert Computer Room Air Conditioning (CRAC) Units. Each Liebert Unit has two R-22 refrigerant circuits each having approximately 120 pounds of refrigerant. Due to operational requirements of the server farm, only one circuit of one Liebert Unit can be down at a time. R-22 Freon can be recycled for #1 and #3 CRAC units if the acid content is acceptable, otherwise new Freon shall be used. CRAC-2 will be completely replaced with a new unit. Completely replace the refrigerant lines for the new CRAC-2 and charge the system. Each of the 6 existing line sets is comprised of one 1 inch line and one 1 1/4 inch line (see drawings for new and existing routing). Replacement lines will use ACR copper piping and will be insulated with Rubatex insulation. Provide insulation blocks at pipe supports and aluminum jacket around exterior piping to protect insulation. There will be combination isolation/shraeder valves installed at the condenser end of the new portion of the line sets as well as isolation/shraeder valves installed on the linesets just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor. The result will be two isolation/shraeder valves on each line. Include installation of replaceable filter dryer assemblies. Linesets will exit the building through the concrete precast wall at approximately 12 feet high. Lines will be supported by pipe stands or hangers keeping at least a 12 foot clearance above the ground until they reach the condensing units. Note: The contractor will ensure cooling to the server farm is maintainted during the performance of this work by only having one circuit of each CRAC unit down at a time. Air conditioning must be sufficient to keep the server farm continuously at 73 degrees +/- 2 degrees. Task 2: Replace CRAC-2 in its intirety. The new unit will consist of an interior 30 Ton Precision Cooling System CRAC Unit with a new 30 Ton DX Air-Cooled Microchannel Condensing Unit. The new units will be installed in the same locations as the old interior/exterior systems. Due to the criticality of the server farm, it is critical the demolition of the existing CRAC only occur immediately prior to the installation of the new unit. Install combination isolation/shraeder valves at the condenser end of the line sets as well as just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Mr. Darin L Brun and SMSgt Brent Geschwentner at the following addresses: Darin.brun@us.af.mil & brent.geschwentner@us.af.mil Firm Name and Telephone Number Visitor's Name Drivers License Citizenship Project magnitude is betw een $100,000.00 and $250,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents