Similar Projects
Woodward Avenue Road and Utility Improvements
Bidding
Less than $500,000 est. value
Eustis, FL 32726

Shoulder Rework and Culvert Pipe Desilt
Bidding
Less than $1,110,675 est. value
FL

Road, Drainage, and Sidewalk Construction Job Order Contract, Projects
Post-Bid
Less than $200,000 est. value
Tavares, FL 32778

Storm Drain System Cleaning and Video Inspections
Term Contract
Results
FL

Swale and Ditch Digging and Related Services
Term Contract
Results
Tavares, FL 32778

Shoulder Rework and Ditch Repair
Results
Less than $816,000 est. value
FL

Western Way Storm Drain Improvements
Results
$125,000 to $145,000 est. value
Leesburg, FL

Polypropylene Pipe/HDPE Pipe
Results
FL

LSSA-NSU and NSU-CSU Potable Interconnect
Results
Less than $86,000 est. value
The Villages, FL

District No. 10 Wetland 88 Equalization Transfer Pipe
Results
The Villages, FL

Drainage Repair
Results
Less than $670,500 est. value

CR 466A Phase 3B Pond 4
Results
Tavares, FL 32778

Sun Land Citrus Trail Road Improvements and Culvert Replacement
Results
Less than $43,750 est. value
Eustis, FL

Hilochee Phase 2 - Structure Replacement
Results
Less than $365,000 est. value
Clermont, FL 34714

Desilt and Video
Results
Less than $667,452 est. value
FL

Last Updated 07/17/2020 12:23 PM
Project Title

Lake Yale Marsh Park Stormwater Project

Physical Address View project details and contacts
City, State (County) Eustis, FL   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $155,077
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Lake Yale Marsh Park Stormwater Improvements project is located in Eustis, off of Yale Retreat Road. It involves creating a linear water quality treatment pond out of an existing remnant canal at Marsh Park on Lake Yale. Project will entail excavation and re-contouring of upland area of the canal bank to create additional storage and littoral areas to receive wetland plantings. Other work associated with this project shall include: structure and culvert installation, dewatering, sodding, and other miscellaneous incidental construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents