Similar Projects
Last Updated | 02/28/2022 10:19 AM |
Project Title | 2021 Lakes of Pine Forest Submerged Storm Sewer Cleaning and Televising - Phase I |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77282 (Harris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of cleaning and televising approximately 16,475 linear feet of submerged storm sewer pipe including approximately 8,800 linear feet of 24-inch storm sewer pipe, 2,500 linear feet of 30-inch storm sewer pipe, 2,250 linear feet of 36-inch storm sewer pipe, 525 linear feet of 42-inch storm sewer pipe, 325 linear feet of 48-inch storm sewer pipe, 750 linear feet of 54-inch storm sewer pipe, 25 linear feet of 60-inch storm sewer pipe, and 1,300 linear feet of 7-foot by 9-foot storm sewer box culvert. The Contractor will be required to plug the downstream manhole nearest to the storm water quality pond outfall; pump out the water, sediment and grit from the upstream storm sewer facilities via the plugged manhole; and clean and televise the upstream storm sewer facilities. The need for bypass pumping shall be considered. The work also includes television inspection of approximately 104 storm sewer manholes and 108 storm sewer inlets (of various types). |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |