Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Paving and Catch Basin Improvements at Family Development
Infrastructure
Bidding
$1,500,000 est. value
Auburn, ME 04210

Mill, Main and Broad Streets Intersection and Corridor Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Auburn, ME 04210

Lead Abatement Project - 30 Academy Street
Term Contract, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Auburn, ME 04210

Field Hockey Earth Work Project
Infrastructure
Sub-Bidding
$2,400,000 CJ est. value
Wales, ME 04280

2022 Crack Sealing Program
Infrastructure
Post-Bid
Auburn, ME

Snow Plowing and Removal
Term Contract
Post-Bid
Auburn, ME

Intersection Improvements
Results
Auburn, ME 04210

On Call Milling Machines and Grinders
Results

Residence at Great Falls
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Lewiston, ME 04240

Paving Project
Infrastructure
Bidding
$250,000 CJ est. value
Wales, ME 04280

Hart Brook Shade Trees
Term Contract
Sub-Bidding
Lewiston, ME 04240

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

On Call Maintenance Paving
Results

Last Updated 08/05/2022 06:05 AM
Project Title

2022 Water Main Replacement

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $848,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the 2022 WATER MAIN REPLACEMENT shall consist of, but not be limited to, the complete and satisfactory construction of installation of: - 1,400 LF of 8" Dia. DI Water Main - 2,100 LF of 6" Dia. DI Water Main - 5,850 SY of Pavement Removal - 2 Hydrants - 581 Ton of 12.5mm HMA Surface Course The work will include installation of the water main and services along portions of Pineland Street, Bosse Street, Bobby Street, Stevens Street, and Adele Street, as indicated on the plans. Work shall also include trench pavement reconstruction within the project limits, as indicated on plans. Water service is to be maintained in existing water main during new main installation. Coordinate with the Water District for requisite shut downs No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of ten percent (5%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work. Questions and Requests for Information shall be submitted to Faith Thomas (fthomas@lewistonmaine.gov) on or before noon, August 11, 2022. Questions and RFIs will be responded to via email to potential bidders on the Plan Holders List and those registered with the City Purchasing Department for this project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents