Similar Projects
Domestic Water and Heating Pipe Insulation
Post-Bid
Boulder, CO 80303

Air Conditioning - Design Build
Post-Bid
Boulder, Louisville, CO

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Fairgrounds Exhibit Building Chiller Replacement
Results
Longmont, CO 80501

Sources Sought - Cryogenic Dilution Refrigerator System
Post-Bid
Boulder, CO

Notice 20-01-Rfp-Umc-Bldg-Recommissioning
Results
Less than $800,000 est. value
Boulder, CO

Nist Boulder Building 42 Cooling Tower Capacity Upgrade
Post-Bid
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

Saint Vrain HUB - AHU Replacement
Results
Longmont, CO 80501

Purchase and Delivery of Roof Top Unit (RTU) - Lyons High School
Post-Bid
Lyons, CO 80540

Replace Windows, Stairs and HVAC at Longmont Readiness Center
Results
Less than $350,000 est. value
Longmont, CO 80501

CP291773 - Camp - CHW Plant Enhancement Project
Post-Bid
Less than $5,000,000 est. value
Boulder, CO 80303

Chiller Replacement
Results
Longmont, CO 80503

NIST Building 42 Central Utility Plant - Cooling Tower Upgrade
Post-Bid
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

Courthouse Third Floor Remodel Mechanical HVAC and Plumbing
Results
Boulder, CO 80302

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Reported 01/22/2020 12:00 AM
Project Title

Upgrade HVAC Compressed Air

Physical Address View project details and contacts
City, State (County) Boulder, CO   (Boulder County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing compressed air distribution piping, air filters, air dryers, and air compressors at the existing compressed air production facilities located in Ekeley Science (Building 226) and Electrical Engineering (Building 444). The compressed air facilities shall be interconnected with the existing compressed air facility located at the West District Energy Plant (WDEP). All three (3) compressed air stations shall be interconnected by one (1) common compressed air distribution system and include a hierarchical control architecture with one master controller located in the WDEP (Building 354). The Project will also install new distribution air filters and air dryers at multiple buildings on the main campus that require dryer and cleaner compressed air than the central plant compressed air stations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents