Hidden Forest East 2nd Addition
New Construction, Infrastructure
Conception
$16,400,000 CJ est. value
Ham Lake, MN 55304

Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

Bluegrass Estates Residential Development 3rd Addition / Ham Lake
New Construction, Infrastructure
Design
$6,200,000 CJ est. value
Ham Lake, MN 55304

Anoka Metro Regional Treatment Center - Miller Building Upgrade
Build-out, Renovation, Infrastructure
Design
$6,600,000 CJ est. value
Anoka, MN 55303

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Central Avenue Sewer Manhole Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Columbia Heights, MN 55421

Multi-Site LV Improvements Phase 4
Infrastructure
Results
Minneapolis, MN

2022 Street Surface Improvement Project
Infrastructure
Results
$2,400,000 est. value
Anoka, MN

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Radisson Hills
New Construction, Infrastructure
Construction
$18,000,000 CJ est. value
Blaine, MN 55449

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Andover Boulevard NE Office Building
New Construction, Infrastructure - 13,600 SF
Conception
$2,900,000 CJ est. value
Ham Lake, MN 55304

Radisson Road Day Care Center / Ham Lake
New Construction, Infrastructure - 10,572 SF
Design
$2,146,116 CJ est. value
Ham Lake, MN 55304

Last Updated 02/14/2024 09:30 AM
Project Title

2022 Neighborhood Pavement Overlay Improvements

Physical Address View project details and contacts
City, State (County) Ramsey, MN 55303   (Anoka County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $732,929 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 18, 2022, project was awarded to North Valley, Inc., awarded amount is $732,929.10. The work generally consists of pavement mill and overlaying 2.66 miles of public streets across 4 subdivision within the City of Ramsey. The work is estimated to include: - 45,953 square yards of bituminous pavement milling,- 4,603 tons of bituminous pavement, - 432 square yards of bituminous pavement patching, - 1,373 lineal feet of concrete curb & gutter, - 347 square yards of concrete walk, and - Miscellaneous other improvements. It is anticipated that a contract will be awarded on May 10, 2022, and that work may begin on or about June 1, 2022. Each bidder shall submit a bid bond made payable to the City of Ramsey in the amount of 5% of the total bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. The online bid must be completed and submitted, all addenda acknowledged and acknowledgement uploaded to the site, and a copy of the bid bond uploaded to the site. The original bid bond must be delivered to the City within 2 business days after the bid opening. No bidder may withdraw their bid for at least 45 days after the scheduled closing time for the receipt of bids. The City of Ramsey reserves the right to reject any or all bids, and to waive informalities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents