Similar Projects
Springdale Wastewater Lagoon Improvements Headworks Powered Screen
Infrastructure
Bidding
$700,000 CJ est. value
Springdale, UT 84767

Ash Creek Pipeline Project - Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
St George, UT 84770

Springdale Wastewater Lagoon Improvements Sand Filtration
Renovation, Infrastructure
Sub-Bidding
$600,000 CJ est. value
Springdale, UT 84767

New State Bank of Southern Utah Steel Bid Package 1
New Construction, Infrastructure
Sub-Bidding
$500,000 CJ est. value
St George, UT 84790

Remodel of the Structure at 680 Zion Park Boulevard
Post-Bid
Springdale, UT 84767

Sky Mountain Power Substation Grading and Utilities
Infrastructure
Post-Bid
Hurricane, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

SGES Bore Project - Riverside Drive
Infrastructure
Results
Saint George, UT 84790

Black Desert Resort
New Construction
Construction
Ivins, UT

Cottonwood Hollow
New Construction
Construction
La Verkin, UT 84745

Stone Cliff
New Construction
Pending Verification
Saint George, UT 84790

Tava Resort at Sand Hollow
New Construction
Pending Verification
Hurricane, UT 84737

Onset Financial Core & Shell Bid Package #4
New Construction, Infrastructure - 58,000 SF
Post-Bid
$12,000,000 CJ est. value
St George, UT 84770

Corderro Development Phase 1
New Construction
Construction
Hurricane, UT 84737

The Hills at Santa Clara Phase 3
New Construction
Pending Verification
Santa Clara, UT 84765

Last Updated 08/02/2022 10:04 AM
Project Title

The Cove at Desert Color

Physical Address View project details and contacts
City, State (County) St George, UT 84790   (Washington County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $6,800,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 14, 2022 this project is Bidding. Architect information has not been disclosed. Information regarding subcontractor bidding opportunities have not been disclosed. While a firm construction timeline has not yet been established, construction is expected to begin in the first quarter 2022.

Details

3 Stories Above Grade, 29,271 SF Apartments, 20 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents