Similar Projects
New HVAC - Alpha Center
Alteration
Bidding
McComb, MS 39648

Center Hill High School HVAC Replacement
Alteration
Bidding
Olive Branch, MS 38654

THS PAC Chiller
Post-Bid
Tupelo, MS 38804

HVAC Maintenance at City of Brookhaven Owned Facilities
Post-Bid
Brookhaven, MS

HVAC Control System
Results
MS

2020 HVAC & Electrical Upgrades
Results
$1,500,000 est. value
Tupelo, MS

Chickasaw Elementary School HVAC Replacement
Alteration
Bidding
Olive Branch, MS 38654

HVAC Improvements
Post-Bid
Jackson, MS

Renovation of 37,000 SF Industrial Building - Contract No. 2 - HVAC Unit Replacement
Results
Tylertown, MS

Center Hill Elementary School HVAC Replacement
Alteration
Bidding
Olive Branch, MS 38654

HVAC Service Provider
Term Contract
Post-Bid
Ellisville, MS 39437

Bureau of Building 321-268 Housing Units HVAC Mississippi State Penitentiary
Results
Tutwiler, MS 38963

Gymnasium and Field House HVAC Renovations
Alteration
Bidding
Kosciusko, MS

Chiller Replacement
Term Contract
Post-Bid
Ellisville, MS

Long Beach Library - HVAC System Repairs
Results
$165,100 est. value
Long Beach, MS

Reported 10/13/2021 12:00 AM
Project Title

Biloxi Upper Elementary School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39530   (Harrison County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of and renovation of HVAC facility upgrades located at: Biloxi Upper Elementary 1424 Father Ryan Avenue, Biloxi, MS 39530. This project consists of The project involves of the replacement of a 100 ton condensing unit, two 50 ton evaporator coils (in separate air handlers), all associated refrigerant piping, and accessories in their entirety at the Upper Elementary school. The existing air handlers shall remain. The existing system supplies cooling to the gymnasium and the auditorium. The new system consists of two 50 ton condensing units to replace the single 100 ton unit, thereby separating the operation of the auditorium from the gym and simplifying the controls. Additionally, electrical and control upgrades are also involved.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents