Similar Projects
Last Updated | 08/12/2023 04:03 AM |
Project Title | Emergency Generators |
Physical Address | View project details and contacts |
City, State (County) | Columbus, OH 43215 (Franklin County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $897,800 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of November 18, 2021 a engineer has been selected for the project. Although a firm timeline for construction has not been determined, construction is not expected to start prior to March of 2022. *The closed solicitation has been included below for reference: Submit all questions regarding this RFQ in writing to Timothy Shepard at shepard.74@osu.edu with the project number included in the subject line (no phone calls please). This project will replace and or repair the generators at Sisson Hall, Rightmire Hall, and Mershown Auditorium. OSU reserves the right to alter this list. A hazardous material assessment will be required for both locations. The project and construction budget as listed in this RFQ is estimated. For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the Program of Requirements. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A -A/E Terms and Conditions Article 7.2.6 The method of contractor selection has not been determined at this time. All questions were due to Fishbeck by 5:00 p.m., July 31, 2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |