Similar Projects
New Digester - City of Rome
Infrastructure
Conception
$8,000,000 CJ est. value
Rome, GA 30161

Etowah Tramsmision Line - City of Rome
Infrastructure
Conception
$5,000,000 CJ est. value
Rome, GA 30161

Gibbons Street Multi Residential / Rome
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Rome, GA 30161

Driveway Improvements for Model Elementary, Middle, and High School
Infrastructure
Design
$750,000 CJ est. value
Rome, GA 30161

Construction of a Bridge and Approaches on US 27/SR 1
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Rome, GA 30165

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

New Rome Middle School
New Construction, Infrastructure - 373,000 SF
Post-Bid
$114,000,000 CJ est. value
Rome, GA 30161

Potts Hollow Trail Head Parking Lot - Pinhoti Trail
Infrastructure
Results
$85,000 CJ est. value
Rome, GA 30161

Construction of Equipment and Pipe Storage Buildings
New Construction, Infrastructure
Results
$2,837,527 CJ est. value
Rome, GA 30161

Construction of a Bridge and Approaches on SR 293
Demolition, New Construction, Infrastructure
Construction
$8,530,527 CJ est. value
Rome, GA 30161

The Varsity / Rome
New Construction, Infrastructure
Construction
$2,250,000 CJ est. value
Rome, GA 30161

Turner McCall Boulevard Bridge - Georgia Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$30,433,726 CJ est. value
Rome, GA 30161

East 1st Street Apartments
New Construction, Renovation, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Rome, GA 30161

Hawthorn Suites by Wyndham / Rome
Addition, Infrastructure
Design
$9,000,000 CJ est. value
Rome, GA 30161

Lee Avenue Multi Residential Development
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Rome, GA 30161

Last Updated 09/12/2023 07:32 AM
Project Title

Dodd Blvd. Storm Drainage Replacement/rehabilitation

Physical Address View project details and contacts
City, State (County) Rome, GA 30161   (Floyd County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $969,375 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000325294 Construction of dodd blvd. Storm drainage replacement/rehabilitation The project shall consist of the removal and disposal of 650 +/- liner feet of existing 72-inch corrugated metal pipe and structure(s) and replacing said pipe with new 60" reinforced concrete pipe and new structures. Each new structure will also have a weir constructed therein from the manufacturer to aid with stormwater management. There are areas where the existing pipe and the new pipe are in or close to the same ditch line, but in other areas they are farther apart. The bidder shall review the drawings for the project which shows the location of the existing pipe as well as the new pipe and structures. Portions of this project cross existing driveways of businesses and it shall be the full and complete responsibility of the successful bidder to coordinate with the owner/tenant as required to ensure that those businesses are NOT adversely impacted by the construction of this project. Existing driveways shall be replaced to the limits shown on the plans or as directed by the ENGINEER in compliance with the Drawings. This project also includes the construction of a concrete bottom in an existing 72-inch corrugated pipe which the bottom has rusted out of within most of the pipe. This pipe is approximately 425 in length with limited access. Access points are shown on the construction drawings for the project. Contract shall be 120 consecutive calendar days for completion of the work, to be computed from the date of the Notice to Proceed. All Bids must be accompanied by the Bidder's Declaration, Non-Collusion Affidavit, Certificate of Non-Discrimination, Bid Bond, List of Contractors, SAVE, E-Verify Compliance Affidavit, State of Georgia Prompt Pay Act Affidavit, Drug-Free Workplace Certificate, Taxpayer Identification Number and Certification for the project. Any Bid not having all required documents fully executed will be considered incomplete. The bid bond accompanying the bid must be in an amount of not less than 5% of the total amount of the bid. The successful bidder, if awarded the project, will be required to furnish a Performance Bond and Materials Payment Bond, each in the amount of 100% of the contract amount if the contract exceeds $100,000.00 dollars. The City of Rome Georgia reserves the right to reject any or all bids, to waive informalities, and to re-advertise if necessary. Question Deadline 07/27/2023 at 5:00 PM ET All questions should be submitted to the City of Romes Direct website

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents