Similar Projects
Last Updated | 10/13/2023 05:34 PM |
Project Title | Milwaukee Avenue Section 5 Improvements W. Logan Boulevard to W. Belmont Avenue |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60661 (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $27,413,631 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for which proposals are invited consist of furnishing all labor, materials, and equipment required for the following work in the City of Chicago: Roadway resurfacing and/or reconstruction along Milwaukee Avenue from W. Logan Blvd. to N. Davlin Ct, including the roadways around Logan Square and Kedzie Avenue from Milwaukee Avenue to Schubert Avenue Realignment of Milwaukee Avenue within Logan Square. Realignment of Kedzie Avenue at CTA Logan Square Blue Line Station. Sidewalk replacement throughout the corridor Shared use paths within Logan Square and separated bicycle lanes in some areas. Curb and gutter replacement throughout the corridor Drainage improvements throughout the corridor Lighting removal and replacement throughout the corridor Electrical receptacle installation within Logan Square Traffic signal installation, modernization, and retiming at seven intersections Installation of trees, landscaping, and streetscape furniture Modifications to the existing canopy at the CTA Logan Square Blue Line Station. Pavement markings and signage throughout the corridor Coordination with CTA for bus stop and shelter modifications Deadline for Questions: 04:00 PM Central Time, 26-JUL-2024 Pre-Solicitation Conference Date and Time: 10:00 AM Central Time, 18-JUL-2024 Bid Deposit: 5% of Total Base Bid Contract DBE Participation Goal: 27.5% of Total Base Bid The City reserves the right to check all calculations and to correct all extensions in case of error. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |