Similar Projects
Commonwealth Heights
New Construction
Conception
Marlborough, MA

Patriot Pines
New Construction
Conception
Carver, MA

Greystone Village Subdivision
New Construction
Design
Kingston, MA 02364

Triple Crown Estates Phase 2
New Construction
Design
Tyngsborough, MA 01879

Development of Affordable or Mixed-Income Housing at 4 Littleton Drive
Post-Bid
Wareham, MA 02571

Full Renovation to the First Floor of Two Family House
Renovation
Post-Bid
Less than $130,000 est. value
Winchester, MA 01890

Housing Rehabilitation Services for an FY19
Results
Less than $103,000 est. value
Scituate, MA

Bathroom Renovations
Renovation
Results
Less than $28,652 est. value
Dracut, MA 01826

Abby Road Subdivision
New Construction
Construction
Winchester, MA 02135

Copperwood Circle
New Construction
Construction
Pembroke, MA

Milot Road Subdivision
New Construction
Pending Verification
Westford, MA

Thorncliff Avenue Residence
New Construction
Pending Verification
Lowell, MA 01851

Sylvia Pond Estates
New Construction
Design
Kingston, MA 02364

Rhodes Circle Two-Family Dwelling Rehabilitation Project
Post-Bid
Less than $150,000 est. value
Hingham, MA 02043

Basement Repairs from Water Infiltration and Remedial Work
Results
Less than $30,000 est. value
Marshfield, MA 02050

Reported 05/22/2020 12:00 AM
Project Title

Domestic Hot Water (DHW) and Electrical Switchgear Replacement

Physical Address View project details and contacts
City, State (County) Kingston, Silver Lake, MA 02364 (Middlesex, Plymouth Counties)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $134,679
Plans Available from Copy Center - 05/06/20
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Removal and replacement of the electrical switchgear for the entire site located in building #3 per the documents herein; construct new mechanical room in building #3 as shown; install a new domestic water heater and related piping in the newly constructed mechanical room as shown.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents