Similar Projects
24 and Half Development
New Construction, Renovation - 12,230 SF
Conception
$50,000,000 est. value
Paterson, NJ 07505

Holy Institution Panagia Soumela
New Construction, Addition - 10,978 SF
Design
West Milford, NJ 07480

Construction Administration Services for the Quarry Lawn and River Walk Park Development Project
Renovation
Bidding
Paterson, NJ

2022 Road Resurfacing Program
Infrastructure
Bidding
Wayne, NJ

Hofstra Park Soccer Field Improvements
Post-Bid
Prospect Park, NJ

Lot 7 Stairs Replacement
Alteration
Post-Bid
Little Falls, NJ

Colfax Avenue Improvements Project
Results
Pompton Lakes, NJ 07442

McBride Avenue Streetscape Phase 7
Results
Less than $460,475 est. value
Woodland Park, NJ 07424

Quarry Lawn and River Walk Improvement Project Block 4601, Lots 1, 2, and 4
Renovation
Bidding
Paterson, NJ

Playground Improvements at Wagaraw Road
Renovation
Post-Bid
Hawthorne, NJ 07507

PAL Turf Field
Results
Totowa, NJ 07512

T0278 - Concrete Curb, Sidewalk and Gutter Construction - NJDOT
Infrastructure
Post-Bid

Installation of Synthetic Turf for PAL Turf Field
Results
Totowa, NJ 07512

Christopher Columbus Park Parking Improvements
Infrastructure
Post-Bid
Passaic, NJ 07055

Lou Costello Memorial Park Improvements
Results
Paterson, NJ 07501

Reported 03/11/2022 12:00 AM
Project Title

Garret Mountain Reservation Improvements - Phase 2

Physical Address View project details and contacts
City, State (County) Woodland Park, NJ 07424   (Passaic County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Park/Playground, Restroom/Bath House, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the reconstruction of the auto overlook as well as the construction of a new playground, new parking lots, and new comfort station. The work will include but not be limited to the installation of pavements, curbs, steps, plantings, play equipment, fitness equipment, water service and drainage structures.

Details

Park/Playground, New Construction, Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents