Similar Projects
Replacement Heaters at the Water Treatment Plant
Bidding
Harbor Beach, MI 48441

Replacement Boilers - Chippewa Hills School District
Bidding
Remus, MI 49340

Storm Water Mechanical and Electrical Systems Replacement Project
Post-Bid
Harrison Township, MI 48045

Construction Work for an Energy Performance Contract for Electric/Plumbing/ Mechanical/Build/Appliances
Post-Bid
Saint Joseph, MI 49085

Boiler Replacement for Columbiaville Elementary
Results
Less than $173,250 est. value
Columbiaville, MI 48463

Boiler Controls Upgrade
Results
Dollar Bay, MI 499220350

Boiler Replacements
Bidding
Munising, MI

Mechanical Improvement Projects Services
Post-Bid
Grand Rapids, MI

East McNair Steam Trap Replacement
Results
Less than $185,849 est. value
Houghton, MI 49931

Pump Station Maintenance Program
Bidding
Southfield, MI

Boiler Pre-Pricing Package
Post-Bid
Walled Lake, MI

Replace Bldg. 570 Boiler "Mulligans"
Results
$25,000 to $100,000 est. value
Harrison Township, MI 48045

2021 Mechanical System Improvements
Bidding
Coopersville, MI

Stevenson High School Mechanical Upgrades
Post-Bid
Sterling Heights, MI

DNR Escanaba Field Office Boiler Replacement
Results
Less than $83,955 est. value
Gladstone, MI

Last Updated 05/15/2020 09:22 AM
Project Title

Mechanical Oxidation Ditch Aerator Replacement

Physical Address View project details and contacts
City, State (County) Brighton, MI   (Livingston County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of installation of a new Mechanical Oxidation Ditch Rotor/Aerator. The aerator that is being replaced is a horizontal brush type, 27’ long with 52 brush assemblies. The work will consist of the following: 1. Removal of existing torsion coupling from the existing Flender gearbox. 2. Preparation of the concrete openings for mounting the outboard bearing and wall plates/seals. 3. Installation of rotor body assembly with blades and splash guards. 4. Installation of a new outboard bearing. 5. Installation of a new torsion coupling. 6. Installation of two wall assemblies and all related seals. 7. Reinstall existing Flender gearbox. 8. Reinstall existing motor and belts. 9. Check wall seals for proper adjustment and leakage.

Details

Division 46 - Water and Wastewater Equipment, Biological Treatment Systems, Oxidation Ditch Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents