Similar Projects
Hinsdale Road Reconstruction - City of Fayetteville
Infrastructure
Conception
$1,394,724 CJ est. value
Fayetteville, NC 28305

Hinsdale Road Reconstruction - City of Fayetteville
Infrastructure
Conception
$1,394,724 CJ est. value
Fayetteville, NC 28305

StayApt Suites / Fayetteville
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Fayetteville, NC 28303

StayApt Suites / Fayetteville
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Fayetteville, NC 28303

Widening, Grading, Paving, Signal and Pvt. Mkgs. - SR 1600 - Cumberland
Infrastructure
Post-Bid
NC

PN92793 JSOC (Joint Special Operations Command ) Operations Facility Annex
New Construction, Infrastructure - 25,260 SF
Post-Bid
$25,000,000 CJ est. value
Fort Bragg, NC 28310

Rosehill Road Sidewalk Plan NCDOT Project U-5528Fa
Infrastructure
Results
Fayetteville, NC

EB-6032 Hope Mills Road/NC-59 Sidewalk
Infrastructure
Results
Fayetteville, NC 28312

Grading, Drainage, Paving, Signing, Signals, and Structures
Infrastructure
Construction
$151,850,000 CJ est. value
Fayetteville, NC 28306

Grading, Drainage, Paving, Signing, Signals, and Structures
Infrastructure
Construction
$151,850,000 CJ est. value
Fayetteville, NC 28306

Raptor Tactical Storage
New Construction, Infrastructure - 10,800 SF
Pending Verification
$1,000,000 CJ est. value
Spring Lake, NC 28390

Little Cross Creek Greenway - Phases I and II - City of Fayetteville
Infrastructure
Conception
$510,000 CJ est. value
East Fayetteville, NC 28301

COMET Bridge Extension J And A
Infrastructure
Design
$1,000,000 CJ est. value
Fort Bragg, NC 28310

Fayetteville Fire Department New Sub-station No. 4
New Construction, Infrastructure
Post-Bid
$7,300,000 CJ est. value
Fayetteville, NC 28303

Water Main Extension Project
Infrastructure
Results
$1,665,690 CJ est. value
Godwin, NC 28344

Last Updated 10/04/2023 11:00 AM
Project Title

Yadkin Road Sidewalk Section 3

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28303   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $504,991 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: This project consists of: Section 3 of 3. Install+- 6,243 linear feet (+-1.2 miles) of concrete sidewalk along Yadkin Road (S.R.1415) from Horseshoe Road to Brookfield Road. The Project has an expected duration of 240 days. Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. A Bid must be accompanied by Bid Security made payable to City of Fayetteville in the amount of five (5) percent of the Bidder's maximum Bid price (determined by adding the base bid and all alternates). Bidders must submit an acceptable Bid Security with their Bids as a guarantee that the Successful Bidder will enter into a contract for the Project with the Owner within 90 days from the date of the opening of the Bids. The Successful Bidder must execute the Contract Documents, including performance and payment bonds, and provide evidence of insurance as required by the Contract Documents.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents