Similar Projects
Motion Industries
Renovation
Design
$68,000 est. value
Richmond, VA 23237

Shades of Light
New Construction - 33,960 SF
Design
$300,000 est. value
Midlothian, VA 23113

DLA Warehouse 11 Renovation
Renovation
Bidding
$10,000,000 to $25,000,000 est. value
Richmond, VA 23297

Police and Fire Training Relocation
Post-Bid
Chester, VA 23831

Fedex Ground Round 1
New Construction - 290,795 SF
Post-Bid
Chester, VA 23831

DSCR Building 15 Bay H Renovation
Renovation - 22,000 SF
Results
$3,418,000 est. value
Richmond, VA

Mason Creek Staging Area Intermodal Container Covered Storage
Results

Renovation of Warehouse 11 DLA Richmond, VA
Renovation
Design
$10,000,000 to $25,000,000 est. value
Richmond, VA 23297

8x12x8 Cottage Style Storage Building
Results
Chesterfield, VA

Koger Mini-Price
New Construction, Demolition
Design
$3,500,000 est. value
Bon Air, VA 23235

Culpeper West AHQ Chemical Storage Building
Results

Palmyra Area Headquarters Truck Shed
Results
Richmond, VA 23221

Keene Area Headquarters Truck Shed
Results

DSCR Warehouse 15 Bay G Restoration/Repair
Renovation - 21,000 SF
Results
Richmond, VA 23824

State Headquarters Unheated Storage Building Conversion
Results
Richmond, VA

Last Updated 04/05/2019 01:39 PM
Project Title

Advansix

Physical Address View project details and contacts
City, State (County) Chesterfield, VA 23836   (Chesterfield County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced January 2019
Bids Due View project details and contacts
Estimated Value $920,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The existing Building 12 consists of two buildings (East & West) attached to one another. The East Building is a four-story structure that previously housed process equipment. The equipment has since been removed and the building currently sits vacant. The West Building is a one story structure that served as warehouse and maintenance space supporting the East Building process and also currently sits vacant. The East building area is 3,300 square feet that includes a four-story stair tower and a four-story freight elevator. Within the West building, the warehouse area is 11,800 square feet and the maintenance area is 3,100 square feet. In addition to the building renovation, a second floor will be added to the warehouse area, the one-story building will have an addition constructed for one of the R&D labs, work will be performed in the equipment yard located west of Building 12 for new process / HVAC equipment as well as the construction of a hazardous material storage building.
Details ,, 18,200 SF - 1 Warehouse/Storage, 4 Stories Above Grade, 3,300 SF Renovation, 1 Warehouse/Storage, 1 Story Above Grade, 14,900 SF Renovation, Addition.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents