Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Water Place Housing Boiler Replacements
Alteration
Bidding
CO

Courthouse Gas Boiler Replacement
Alteration
Bidding
Central City, CO 80427

Justice Center Water Heater
Post-Bid
Black Hawk, CO 80422

FCF Boiler Number 1 Equipment Bid Pack 1
Post-Bid
Less than $800,000 est. value
Canon City, CO

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Chiller Plant, Fort Collins, Colorado
Results
$1,000,000 to $5,000,000 est. value
Fort Collins, CO 80521

Franklin Middle School Chiller Plant Replacement
Alteration
Bidding
Greeley, CO 80634

DWCF LU5 Steam Converter Replacement
Post-Bid
Less than $115,000 est. value
Denver, CO 80239

Blake Boiler Replacement
Results
Denver, CO 80202

Town Hall Hot Water Plant
Alteration
Bidding
Parker, CO 80138

Boiler Replacement for Mesa Elementary School
Post-Bid
Westminster, CO 80031

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Boiler Replacement for Recreation Center Pools
Alteration
Bidding
Longmont, CO 80501

Reported 03/12/2022 12:00 AM
Project Title

Jefferson High School Boiler/Chiller Plant Upgrade

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work Provided by Contractor 1. Demo of existing piping in order to pull chiller out of door and tower off roof 2. Rigging and forklifting of old and new chiller and tower replacement 3. Installation of new chiller/tower 4. Removal of control panel on existing chiller to get out of the double door 5. Provide and installation of new 4” steel piping overhead and down to new chiller connections 6. Provide and installation of new butterfly valves at equipment for isolation and service 7. Provide and installation of new Thermometers, pressure gauges and P&T’s (trim out) 8. Provide and installation of support stands and hangers for all piping installed 9. Insulation of all piping disturbed or installed by installation 10. Balancing of HVAC water piping 11. Water samples and chemical treatment if needed 12. Valve tagging and labels 13. Removal of chiller, tower, and pipe associated with project from site

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Expansion Fittings and Loops for HVAC Piping, Heating Boilers, Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents