Similar Projects
Westchester County ATCT HVAC Replacement
Term Contract
Design
$250,000 to $500,000 est. value
White Plains, NY 10604

Kitchen Exhaust Hood Cleaning and Maintenance Service
Term Contract
Design
Montrose, Wappingers Falls, NY 12590

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC
Alteration
Post-Bid

Maintenance and Repairs for the HVAC Control Systems in Yonkers School District
Term Contract
Results
NY

Bipolar Ionization Air Treatment System
Alteration
Results
New Rochelle, NY

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

Upgrade of HVAC Systems for Town Center
Alteration
Results
Mamaroneck, NY 10543

Gas Conversion/HVAC Project for Roosevelt High School
Alteration
Post-Bid
Yonkers, NY 10710

Clinton Street Center HVAC and Refrigeration Equipment Upgrades
Alteration
Results
Pleasantville, NY 10570

H966--USP Compliant Pharmacy Certification/Lab BSC/Fume Hood Cert Base Year
Term Contract
Post-Bid
Castle Point, Montrose, NY 10548

HVAC Preventative Maintenance and Repairs
Term Contract
Results
Cortlandt Manor, NY 10567

Air Conditioners
Alteration
Post-Bid
Yonkers, NY

HVAC Systems and Refrigeration Equipment Services
Term Contract
Results
Mamaroneck, NY 10543

Heat Pump System Service and Maintenance
Alteration
Post-Bid
Yonkers, NY

Last Updated 01/20/2023 02:45 PM
Project Title

Proposed Village Hall Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Buchanan, NY 10511   (Westchester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $214,264 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All bids rejected, will be rebid sometime in the future, no timeline at this time. The work consists of the removal and replacement of an existing boiler with two (2) new boilers. The project is located in the Village of Buchanan. Other related work shall include all necessary work required for a complete installation of the proposed gas service connection, as well as preparing, restoring and cleaning the project area all in accordance with the plans and specifications as directed by the Village Engineer. Bids shall be made on the Proposal Forms, furnished with the Specifications and must be accompanied by a Bid Bond acceptable to the Village, a certified cashier's check, drawn on a solvent bank in the amount of not less than 5% of the total amount of the Bid. Checks shall be made payable to the Village of Buchanan, New York, and are to be held by the Village as a guarantee for the proper execution and delivery of the Contract and bonds to secure the faithful performance thereof. In default of such execution and delivery of Contract and Bonds, the amount of the deposit represented by the check shall be forfeited to and retained by the Village of Buchanan as liquidated damages. The Village of Buchanan reserves the right to reject any and all Bids, to waive any informality in any Bid, and to award the Contract to other than the lowest Bidder if deemed in the best interest of the Village to do so.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents