Similar Projects
Resurface
Infrastructure
Bidding
$2,500,000 CJ est. value
St Peters, MO 63304

Drainage Improvements
Infrastructure
Bidding
$750,000 CJ est. value
Saint Charles, MO 63301

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Chicken N Pickle - Package 2
New Construction, Infrastructure - 24,162 SF
Post-Bid
$5,000,000 CJ est. value
Saint Charles, MO 63303

Water Reclamation Center Phase 3 Expansion
New Construction
Results
Wentzville, MO

Mississippi Plant Clarifier No. 3 Upgrade
Renovation
Results
Saint Charles, MO 63301

Little Sunshine's Playhouse & Preschool
New Construction, Infrastructure - 11,354 SF
Pending Verification
$2,000,000 CJ est. value
Lake Saint Louis, MO 63367

Cedarhurst of Wentzville
New Construction, Infrastructure - 132,000 SF
Pending Verification
$15,600,000 CJ est. value
Wentzville, MO 63385

Highway B Road Widening Package for the New Orchard Farm High School
Infrastructure
Bidding
$500,000 CJ est. value
Saint Charles, MO 63301

Wentzville Parkway and I-70 Interchange
Infrastructure
Post-Bid
$400,000 CJ est. value
Wentzville, MO 63385

Missouri River Recovery Project Cora Chute Rehabilitation
Infrastructure
Results
$9,585,138 CJ est. value
Saint Charles, MO 63301

Scrubbles Car Wash
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,100,000 CJ est. value
Saint Peters, MO 63376

Boschetown Road Project Phase II
Infrastructure
Bidding
$700,000 CJ est. value
Saint Charles, MO 63301

Raising Cane's #913 / Wentzville
New Construction, Infrastructure - 3,682 SF
Post-Bid
$1,500,000 CJ est. value
Wentzville, MO 63385

Metal Sided Outbuildings
New Construction, Infrastructure
Results
$295,091 CJ est. value
Saint Charles, MO 63301

Last Updated 08/18/2022 10:45 AM
Project Title

EIFS Repair to Water Plant, Headworks and West Dock

Physical Address View project details and contacts
City, State (County) Saint Peters, MO 63376   (Saint Charles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $7,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of St. Peters is seeking quotes for EIFS repairs to the City of St. Peters Water Plant, Headworks & West Dock. Direct All Inquiries to: bids@stpetersmo.net with "RFQ No. 22-23606 - EIFS Repair to Water Plant, Headworks & West Dock" in subject line The last day for questions is before noon local time, Monday, August 15, 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents