Similar Projects
Construction of Devonwood Lower Dam
Post-Bid
Fayetteville, NC

Dam Remote Valve Operation System
Post-Bid
Raleigh, NC

Z--Project 659-19-117 (VA-19-00055), Halls & Flooring Multiple Campus Buildings
Renovation
Results
$500,000 to $1,000,000 est. value
Salisbury, NC 28144

Fabrication of Hydraulic Steel Structures for Falls and Jordan
Results
NC

Falls Lake Dam, Vertical Lift Gate - Hydraulic Steel Structure Fabrication
New Construction, Term Contract
Post-Bid
NC

Neuse River-Goldsboro Section 1135
Results
$5,000,000 to $10,000,000 est. value
Goldsboro, NC 27530

Hydraulic Steel Structure Fabrication of Vertical Lift Gate, Emergency Gate, and Service Gate
Renovation
Post-Bid

USS NC Battleship Phase 2 Hull Repairs
Results
Less than $2,500,000 est. value
Wilmington, NC 28401

WC Dam 2 - Hatcher`s Grove Auxiliary Spillway Repair
Renovation
Post-Bid
Cary, NC

Levee Repairs - Princeville, North Carolina (Edgecombe County)
Results
$500,000 to $1,000,000 est. value
Princeville, NC

Lake Tabor Dam Spillway Repairs Project
Results
Tabor City, NC 28463

Watershed Restoration Project - Phase 1
Results
Jacksonville, NC 28541

Boiling Spring Lakes Dam Construction/Reconstruction Project
Results
Southport, NC 28461

Tar River Reservoir WTP Dam Aeration
Results
Less than $100,000 est. value
Rocky Mount, NC

Rhodes Pond Dam Repair Project
Results
Raleigh, NC

Last Updated 01/13/2022 08:54 AM
Project Title

Dutch Buffalo Dam Repairs

Physical Address View project details and contacts
City, State (County) Mount Pleasant, NC 28124   (Cabarrus County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dutch Buffalo Dam Repairs This project is for construction of repairs to the dam associated with damage that occurred during Hurricane Florence. The repairs include abandonment of an existing drain system, installation of a temporary stream bypass, construction of a new drain system, repair of scour areas adjacent to the dam abutment, sediment removal from the reservoir, concrete repair to the dam, and installation of a sealant to reduce leakage on Dutch Buffalo Creek in Mt. Pleasant, NC.

Details

Dam/Tunnel, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents