Similar Projects
Last Updated | 01/13/2022 08:54 AM |
Project Title | Dutch Buffalo Dam Repairs |
Physical Address | View project details and contacts |
City, State (County) | Mount Pleasant, NC 28124 (Cabarrus County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 to $300,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Dutch Buffalo Dam Repairs This project is for construction of repairs to the dam associated with damage that occurred during Hurricane Florence. The repairs include abandonment of an existing drain system, installation of a temporary stream bypass, construction of a new drain system, repair of scour areas adjacent to the dam abutment, sediment removal from the reservoir, concrete repair to the dam, and installation of a sealant to reduce leakage on Dutch Buffalo Creek in Mt. Pleasant, NC. |
||||||
Details | Dam/Tunnel, Addition.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |