Similar Projects
Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

I-11 Kingman Crossing Traffic Interchange - City of Kingman
Infrastructure
Conception
$31,500,000 CJ est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 CJ est. value
Kingman, AZ 86401

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 1 - Arizona Department of Transportation (AZDOT)
Infrastructure
Design
$70,000,000 CJ est. value
Kingman, AZ 86401

Section 10 WRP Headworks Improvements
Infrastructure, Renovation
Bidding
$2,400,000 CJ est. value
Bullhead City, AZ 86429

Section 10 WRP Headworks Improvements
Infrastructure, Renovation
Bidding
$2,400,000 CJ est. value
Bullhead City, AZ 86429

Raised Pavement Markers and Curve Signs
Infrastructure
Sub-Bidding
$252,000 CJ est. value
Kingman, AZ 86401

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

RFP D/B - Two Single-family Homes in Peach Springs
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Peach Springs, AZ 86434

Rotary Park Restroom
New Construction, Infrastructure
Results
$129,375 CJ est. value
Bullhead City, AZ 86442

Topock - Kingman Highway (I 40) (Ca Border - Mp 2.54)
Infrastructure
Results
$956,000 CJ est. value
Kingman, AZ 86401

16-2, 18-1 and 18-2 Lift Stations Wet Well Rehabilitations - 18-E-012 - City of Bullhead City
Infrastructure
Pending Verification
$630,000 CJ est. value
Bullhead City, AZ 86429

16-2, 18-1 and 18-2 Lift Stations Wet Well Rehabilitations - 18-E-012 - City of Bullhead City
Infrastructure
Pending Verification
$630,000 CJ est. value
Bullhead City, AZ 86429

Taxiway D Design and Construction - City of Kingman
Infrastructure
Conception
$5,220,000 CJ est. value
Kingman, AZ 86401

Booster Station 5A Upgrades - WT5 - City of Lake Havasu City
Renovation
Design
$500,000 CJ est. value
Lake Havasu City, AZ 86403

Last Updated 07/18/2023 12:20 PM
Project Title

New Water Supply Wells

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86429   (Mohave County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $761,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bullhead City, Arizona is extending an Invitation for Bid The Project involves installing two new production wells for the Bullhead City public water supply system. This work includes drilling, construction, development, testing and disinfection of the new wells. The intent of the project is to drill and construct the two new water supply wells The City of Bullhead City reserves the right to accept or reject any or all responses or parts thereto. Technical Questions regarding the substance of this IFB must be in writing or by email and received no later than July 11, 2023. Questions may then be responded to by written amendment to this document. Oral statements or instructions do not constitute an amendment to the IFB. The work involves installing two new production wells for the Bullhead City public water supply system. Well 24-2 will replace Well 24-1, and the boring S-1 location will provide a new well supply location. This work includes drilling, construction, development, testing and disinfection of the new wells The intent of the project is to drill and construct the two new water supply wells with a design capacity of 1,400 gpm each, or greater. B. Abandonment of existing Well 24-1 is to be bid as an Optional, Owner approved task. C. New Wells 24-2 and Well S-1 are to be constructed to the following design dimensions. The actual final depths shall be finalized by the Engineer from the pilot hole drilling results and provided to the Contractor within 5 days following pilot hole completion and receipt of the sieve analysis results.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents