Similar Projects
Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

Hillsboro - Reedsburg Const / Mill and Overlay
Infrastructure
Conception
$5,000,000 CJ est. value
Reedsburg, WI 53959

Waldo Street Condominiums
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Baraboo, WI 53913

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

Wellhouse #2 and Related Facilities
New Construction, Renovation, Infrastructure
Bidding
$84,405 CJ est. value
La Valle, WI 53941

Municipal Well #2
Infrastructure
Bidding
$200,000 CJ est. value
La Valle, WI 53941

Lake Redstone Swallow Bay Spillway Restoration
Infrastructure
Post-Bid
La Valle, WI

Well Drilling Services
Infrastructure
Post-Bid
WI

Building Demolition and Site Grading
Demolition, Infrastructure
Results
North Freedom, WI

Baraboo and Reedsburg Facilities
New Construction, Infrastructure - 164,640 SF
Results
$10,000,000 CJ est. value
Baraboo, Reedsburg, WI 53913

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Village Forest Park Project - Playground Development
Infrastructure - 2,500 SF
Post-Bid
$540,000 CJ est. value
Baraboo, WI 53913

Clear Span Arched Bridge
New Construction, Infrastructure
Results
Hillpoint, WI 53937

Last Updated 11/29/2022 06:06 PM
Project Title

Rehabilitation of Bridge 334 MP 164.15, Reedsburg Subdivision

Physical Address View project details and contacts
City, State (County) Merrimac, WI 53561   (Sauk County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $21,695,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 29, 2022, this project was awarded to the low bidder including Base Bid (Items 1-48), and approved Additive Bid Alternates - Group "A" (Item 49), Group "B" (Item 50-51),Group "C" (Item 52-56), Group "D" (Item 57-65), and Group "F" (Item 67-70). The Wisconsin & Southern Railroad LLC. (WSOR) issues request for Sealed Bids for furnishing all tools, equipment, materials, labor, supervision, engineering, and transportation required for the Rehabilitation of Bridge 334 MP 164.15, Reedsburg Subdivision, Merrimac Wisconsin, in accordance with, and detailed within the Public Bid Notice, Project Bid Documents, Plans and Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents