Similar Projects
Construction Manager at Risk College Park High School Classroom Additions
Addition
Post-Bid
$12,600,812 est. value
Woodland, TX 77384

Austin High School GMP2
Post-Bid
Austin, TX 78703

Construction Manager at Risk Services for Multiple Projects
New Construction, Addition
Results
$325,300,000 est. value
Prosper, TX 75078

Disaster Recovery Services
Results

New IDEA San Antonio Regional Office
- 15,000 SF
Construction
Less than $3,500,000 est. value
San Antonio, TX 78200

Idea Sports Park Phase I
New Construction - 80,000 SF
Construction
Less than $12,800,000 est. value
Brownsville, TX 78520

Bowie Hs Package 4 - Band Hall Demo and General Trades
Demolition - 9,400 SF
Post-Bid
Austin, TX 78749

Construction Manager at Risk Two Step Process
Results
Royse City, TX 75189

Construction of the McKinney Indoor Tennis Facility
Post-Bid
$9,390,000 est. value
McKinney, TX

Design-Build Services for Downtown Campuses
Post-Bid
Less than $95,000,000 est. value
Dallas, TX

Anna ISD – Multi-Purpose Facility
New Construction
Post-Bid
Dallas, TX

Reported 08/03/2021 12:00 AM
Project Title

Locker Room Additions and Improvements

Physical Address View project details and contacts
City, State (County) Price, TX   (Rusk County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the renovation of four locker rooms attached to the existing competition gymnasium (located on the main District Campus at the intersection of SH42 and FM13), along with a bid alternate for a small storage/laundry building and is generally comprised of the following elements: the renovation generally consists of selective building demolition, construction of new walls, relocation of plumbing, installation of new HVAC, and finishes associated with the locker room. The bid alternate building is a pre-engineered metal building with standing seam metal roofing, metal panel siding, associated earthwork and segmented retaining wall.

Details

Athletic Facility, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents