Similar Projects
ISWM - Refuse and Recycling
Term Contract
Bidding
Scott Air Force Base, IL 62225

ISF - Manure Removal and Feed/Bedding
Infrastructure
Bidding
Springfield, IL

Snow and Ice Removal
Post-Bid
Buffalo Grove, IL 60089

Snow and Ice Control Services of Various Parking Lots
Post-Bid
Aurora, IL

2020 Water Treatment Plant Waste Lime Sludge Removal
Results
West Chicago, IL 60185

2020 Pond Sediment Removal
Results
Des Plaines, IL 60016

Snow Removal
Term Contract, Infrastructure
Bidding
Gurnee, IL

Curbside Residential Solid Waste and Recycling Services
Term Contract
Post-Bid
Bloomingdale, IL 60108

Equipment and Operators for Winter 2020
Results
Rockford, IL

Snow Removal
Infrastructure
Bidding
IL

Waste Hauling Services
Term Contract
Post-Bid
Round Lake, IL 60073

Removal and Disposal of the Existing Asphalt Pavement, Building Demolition
Results
Elgin, IL 60120

Waste and Recycling Services
Infrastructure
Bidding
Chicago, IL

2020 Public Utilities' Spoils Hauling
Renovation
Post-Bid
Joliet, IL 60432

Improvement Consists of Litter/Debris Removal from the Edge of the Pavement to the Pedestrian Barrier on I-55 Expwy from I-355 to Reed Rd
Results
IL

Reported 09/11/2021 12:00 AM
Project Title

Snow Removal

Physical Address View project details and contacts
City, State (County) Fulton, IL 61252   (Whiteside County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 2021-2022 school year. The bid should include price to plow River Bend Middle School parking lot (415 12th Street), Fulton Elementary School parking lot (1301 7th Avenue), the north and south parking lots at Fulton High School (1207 12th Street), and the Bus Garage parking lots (1307 14th Street & 1301 13th Street) is required by 6:00 A.M. Include 12th Avenue from 12th Street to 13th Street, 13th Avenue from 12th Street to 13th Street, and 13th Street between the parking lots south of Fulton High School and the Bus Garage.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents