Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Starbucks and Burger King #4974 / Barstow
Demolition, New Construction, Infrastructure - 5,550 SF
Design
$1,700,000 CJ est. value
Barstow, CA 92311

RFP D/B - Hydrogen Fueling Station
Infrastructure
Bidding
$6,721,180 CJ est. value
Hesperia, CA 92345

Rock Springs Drive Pavement Rehabilitation Project - Rebid 2
Infrastructure
Bidding
$690,000 CJ est. value
Chino Hills, CA 91709

Fort Irwin Simulation Center
New Construction, Infrastructure - 70,000 SF
Sub-Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts (CL2) #6228 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

CA FTNP MOJA 12(1) Cima Road Project
Infrastructure
Results
$27,227,000 CJ est. value
Cima, CA 92364

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Last Updated 03/30/2023 03:10 PM
Project Title

Major Construction - 50 Bed Mental Health Crisis Facility (MHCF)

Physical Address View project details and contacts
City, State (County) Chino, CA 91710   (San Bernardino County)
Category(s) Green Building, Heavy and Highway, Medical
Sub-Category(s) LEED Certified, Medical Office/Outpatient, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $109,890,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The California Department of Corrections and Rehabilitation (CDCR) intends to receive bids and award a contract for the construction of a 50-Bed Mental Health Crisis Facility at the California Institution for Men (CIM) located in Chino, California. Question Deadline 08/24/2022 at 5:00 PM PT Bidders security in the amount of ten percent (10%) of the bid, and appropriate licensing are required of all bidders. This Bid Proposal Must Meet the Disabled Veteran Business Enterprise (Dvbe) 3% Participation Goal. Only Those Proposals That Include the Minimum 3% Dvbe Participation Will Be Considered. This Bid Proposal Must Meet the Disabled Veteran Business Enterprise (Dvbe) 3% Participation Goal. Only Those Proposals That Include the Minimum 3% Dvbe Participation Will Be Considered. Construct a new 50-Bed MHCF at CIM that will provide housing, treatment, and office space to allow for patients in a mental health crisis state or patients requiring other levels of licensed mental health care to be treated. This building will be designed to allow for operation at either MHCF or ICF licensure, and both male and female patients. The building will be approximately 70,000 sf to accommodate housing, administration, treatment, and custody services required to support 50 patients. There will be six individual exercise yards and two group yards on the exterior of the building. Site preparation work will include provisions for extension of existing utilities, including water, wastewater, natural gas, electrical, communications to the proposed building site, and demolition of a former chapel building and in-ground swimming pool. Additional site improvements for the MHCF will include a paved fire access road around the perimeter of the MHCB building, several paved truck delivery areas on the north side of the building, and a new parking lot located outside of the facility’s main security enclosure. The Leadership in Energy and Environmental Design (LEED) goal for this project is to obtain LEED Silver certification.

Details

69,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents