Last Updated | 03/30/2023 03:10 PM |
Project Title | Major Construction - 50 Bed Mental Health Crisis Facility (MHCF) |
Physical Address | View project details and contacts |
City, State (County) | Chino, CA 91710 (San Bernardino County) |
Category(s) | Green Building, Heavy and Highway, Medical |
Sub-Category(s) | LEED Certified, Medical Office/Outpatient, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $109,890,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The California Department of Corrections and Rehabilitation (CDCR) intends to receive bids and award a contract for the construction of a 50-Bed Mental Health Crisis Facility at the California Institution for Men (CIM) located in Chino, California. Question Deadline 08/24/2022 at 5:00 PM PT Bidders security in the amount of ten percent (10%) of the bid, and appropriate licensing are required of all bidders. This Bid Proposal Must Meet the Disabled Veteran Business Enterprise (Dvbe) 3% Participation Goal. Only Those Proposals That Include the Minimum 3% Dvbe Participation Will Be Considered. This Bid Proposal Must Meet the Disabled Veteran Business Enterprise (Dvbe) 3% Participation Goal. Only Those Proposals That Include the Minimum 3% Dvbe Participation Will Be Considered. Construct a new 50-Bed MHCF at CIM that will provide housing, treatment, and office space to allow for patients in a mental health crisis state or patients requiring other levels of licensed mental health care to be treated. This building will be designed to allow for operation at either MHCF or ICF licensure, and both male and female patients. The building will be approximately 70,000 sf to accommodate housing, administration, treatment, and custody services required to support 50 patients. There will be six individual exercise yards and two group yards on the exterior of the building. Site preparation work will include provisions for extension of existing utilities, including water, wastewater, natural gas, electrical, communications to the proposed building site, and demolition of a former chapel building and in-ground swimming pool. Additional site improvements for the MHCF will include a paved fire access road around the perimeter of the MHCB building, several paved truck delivery areas on the north side of the building, and a new parking lot located outside of the facility’s main security enclosure. The Leadership in Energy and Environmental Design (LEED) goal for this project is to obtain LEED Silver certification. |
||||||||||||||||||||||||||||||||||||||||
Details | 69,000 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |