Similar Projects
Last Updated | 04/15/2021 07:12 AM |
Project Title | Rehabilitation - Orangeburg County |
Physical Address | View project details and contacts |
City, State (County) | SC (Orangeburg County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 150.000 Sy Borrow Excavation 1,400.000 Cy Excavation For Shoulder Paving 638.880 Sta Hauling Of Excavated Shoulder Material 638.880 Sta Maintenance Stone 5.900 Ton Hma Shoulder Widening Course 3,194.400 Ton Liquid Asphalt Binder Pg64-22 702.451 Ton Full Depth Asph. Pav. Patching 6" Unif. 565.000 Sy Full Depth Asph. Pav. Patching 8" Unif 25.000 Sy Milling Existing Asphalt Pavement 1.5" 1,760.000 Sy Milling Existing Asphalt Pavement 1.75" 2,900.000 Sy Milling Existing Asphalt Pavement (Variable) 3,350.000 Sy Milled-In Rumble Strip 10.580 Mi Hot Mix Asphalt Surface Course Type c 252.607 Ton Hot Mix Asphalt Surface Course Type d 7,687.320 Ton Driveway Paving-Surface Type d 470.625 Ton Permanent Construction Signs (Ground Mounted) 1,540.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 130.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 64,150.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 150.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 642.000 Lf Railroad Crossing Symbols - Perm.Pvmt.Marking 1.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 4,420.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 51,765.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 130.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 128,300.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 300.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 1,284.000 Lf Railroad Crossing Symbols - Fast Dry Paint 1.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 8,840.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 103,530.000 Lf Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 494.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 50.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 510.000 Lf Sawcut For Loop Detector 170.000 Lf Adjust Drop Inlet Adjust d. i. 3.000 Ea Detectable Warning Material 75.000 Sf Pedestrian Ramp Construction 150.000 Sy Surface Applied Detectable Warning 30.000 Sf Permanent Grassing For Non-Permitted Resurfacing Projects 6.730 Acre |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |