Acquire Land for Runway 33 Safety Sullivan County International Airport (SCIA) - Sullivan County
Infrastructure
Conception
$300,000 CJ est. value
Swan Lake, NY 12783

Acquire Land for Runway 33 Safety Sullivan County International Airport (SCIA) - Sullivan County
Infrastructure
Conception
$300,000 CJ est. value
Swan Lake, NY 12783

Timber Ridge
New Construction, Infrastructure - 80,000 SF
Design
$145,000,000 CJ est. value
Fallsburg, NY 12733

Phase 10 Water Line Replacement Project
Infrastructure
Bidding
$787,700 CJ est. value
Liberty, NY 12783

Culvert Repair Project County Road 33 (CB 198) Over Blind Pond Brook
Infrastructure
Bidding
$408,404 CJ est. value
Eldred, NY 12732

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Terminal Apron Rehabilitation
Infrastructure
Post-Bid
Swan Lake, NY 12783

Structural
New Construction, Infrastructure
Results

Highway
Infrastructure
Results

Route 42 Duplex Community
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
South Fallsburg, NY 12779

Route 42 Duplex Community
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
South Fallsburg, NY 12779

Potable Water Supply Connection (Sullivan County International Airport) - Sullivan County
Infrastructure
Conception
$7,000,000 CJ est. value
Swan Lake, NY 12783

New Bethel Town Hall
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Bethel, NY 12720

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Sullivan County Bridge Membrane & Wearing Surface Replacement
Renovation
Results
NY

Last Updated 03/17/2023 01:07 PM
Project Title

Pile Driving Installation for Two County Bridges, Bridge No. 216 and Bridge No. 272

Physical Address View project details and contacts
City, State (County) Liberty, NY 12754   (Sullivan County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Location -County Bridge 216 7 South Hill Rd. Grahamsville, NY 12740 41.8407, -74.5405 , County Bridge 272 246 Denman Rd.Liberty, NY 12754 41.7601, -74.7019 It is intended to receive sealed bids for Pile Driving Installation for 2 County Bridges, County Bridge 216 on County Route 156, South Hill Rd. over Red Brook in the Town of Neversink and County Bridge 272 on Town Highway 21, Denman Rd., in the Town of Liberty, Sullivan County. 1. The Scope of Work includes, but is not limited to: A. Procure, fabricate and install templates to aid in layout of steel H-pile. B. At County Bridge 216 drive sixteen (16) HP12x63 A572 Grade 50 abutment piles to a minimum embedment depth of twenty-five feet (25') each or further as ordered by the County Engineer should the required load capacity not be achieved as shown on the contract plans. The contractor shall furnish the piles with pile shoes attached to each pile. Splices will not be allowed due to the short estimated length. The contractor shall cut each pile to the cut-off elevation shown on the plans. Dynamic pile testing shall be performed on one (1) H-pile in each abutment to determine load capacity and driving criteria. C. At County Bridge 272, drive twelve (12) HP12x63 A572 Grade 50 abutment piles to a minimum embedment depth of twenty feet (20') each or further as ordered by the County Engineer should the required load capacity not be achieved as shown on the contract plans. The contractor shall furnish the piles with pile shoes attached to each pile. Splices will not be allowed due to the short estimated length. The contractor shall cut each pile to the cut-off elevation shown on the plans. Dynamic pile testing shall be performed on no less than one (1) H-pile in each abutment to determine load capacity and driving criteria. D. The unit bid price for this work shall include the cost of all labor, materials and equipment necessary to complete this work, including piles and shoes, driving equipment, dismantle and removal of pile driving equipment upon completion. One (1) lump sum Mobilization item for each location shall be in the contract, only one (1) Furnishing Equipment for Driving Piles will be in the contract, although there are two (2) separate sites where pile driving will take place. E. All bidders are recommended to inspect the project sites prior to bidding to become acquainted with the locations and conditions under which the work will be accomplished. If prior arrangements are made, County staff will be available to be on-site on Tuesday, March 13, 2023 at 10:00 A.M. at County Bridge 216 then proceed to County Bridge 272. (See Location Map on page 4). Contact Roman DiCio at 845-807-0281 to confirm. F. Sullivan County shall provide Dynamic Pile Testing by an independent consultant. G. Sullivan County shall provide Survey Layout and Control for each location an H-pile shall be driven by the Contractor. H. Sullivan County shall obtain all NYSDEC permits and provide erosion control measures. I. Sullivan County shall excavate to the bottom of the proposed concrete stem at each site. J. Sullivan County shall coordinate relocation of overhead utilities. 2. The Bidder is advised to visit the sites and study the soil boring logs to become acquainted with the location and conditions under which the work will be done (See Location Map). Contract limits extend 150 ft. in both directions from center of each existing bridge along existing road centerline(s). Each road will be closed to traffic and will utilize an off-site detour. A. Bidder shall be responsible for the use of pile driving equipment of the appropriate driving force for HPile driving to proceed past any obstructions encountered. Said hammer shall not be less than 19,500 ft-lb driving force. No additional cost will be allowed for the use of a larger equipment

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents