Similar Projects
C Water Main Renewal
Results
Cleveland, OH

Tower Avenue Water Main (Washington Avenue to Franklin Avenue)
Results
Less than $161,159 est. value
Saint Bernard, OH

Northridge MIU Installation and Water Meter Exchange
Results
Springfield, OH 45501

Selwyn Road Resurfacing and Waterline Replacement
Results
$1,478,691 est. value
Cleveland Heights, OH 44118

Olive Street 8-Inch Waterline Replacement
Results
Less than $130,000 est. value
Findlay, OH 45840

Water Supply Line
Results
Toledo, OH 43604

Repair, Replace, and Maintain Various Types of Valves, Actuators, and Appurtenances
Results
Cleveland, OH

Navarre Avenue Waterline Replacement Phase 1
Results
Less than $2,655,145 est. value
Oregon, OH 43616

Township Road 185 and Township Road 179 Water Improvements
Results
Less than $310,000 est. value
Bellefontaine, OH 43311

Contractual Repair of Water Mains, Fire Hydrants, Valves, Service Connections, and Appurtenances Area A
Results
Cleveland, OH 44114

Ampoint Water Main Replacement - Phase I Wl-139E
Results
Less than $1,500,000 est. value
Bowling Green, OH 43402

Valves and Appurtenances
Results
Cleveland, OH 44114

Primary Road Fire and Domestic Waterline Improvements
Results
Cleveland, OH 44114

Glyco II Forcemain Replacement - Contract A
Results
$1,639,924 est. value
Painesville, OH

Curb Stop Boxes
Results
Cleveland, OH 44114

Last Updated 05/25/2021 10:19 AM
Project Title

Haskins Road Transmission Main Valve Replacements

Physical Address View project details and contacts
City, State (County) Bowling Green, OH 43402   (Wood County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $731,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project involves the isolation, removal and replacement of three existing valves and installation of one new valve along the Haskins Road transmission main between the City and the Bowling Green Water Treatment Plant. Additionally, a permanent 24-inch bypass water main will be constructed near the Haskins Road and King Road intersection, this work includes a jack and bore under Haskins Road.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents