Similar Projects
Last Updated | 09/01/2022 01:31 AM |
Project Title | Allied Health Air Handler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Cumberland, MD 21502 (Allegany County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $290,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Allegany College of Maryland Rooftop Air Handler Replacement Project Allegany College of Maryland proposes to provide and install a new roof mounted air handling units to directly replace the existing air handling units. Allegany College invites interested HVAC contractors submit a bid. All submissions should be sent to the below address. Mrs. Sherry Buffenmyer Director of Fiscal Affairs Allegany College of Maryland 12401 Willowbrook Road, SE Cumberland, MD 21502-2596. The College reserves the right to reject any or all submissions and may request other submissions with a subsequent announcement and advertisement. The College reserves the right to negotiate with the firm or firms whose proposal it feels is in the best interest of the College. DESCRIPTION OF WORK TO BE PERFORMED: 1. Demolition of the existing Roof Mounted Air Handling Units and glycol circulation pumps for direct replacement. 2. Furnish and install new Roof Mounted Air Handling Units to directly replace the existing AHUs. The new AHUs will be complete with hot water heating coils, chilled water coils, supply air fans, MERV 13 filters, air stream UVGI lights and have new controls tied into the campus ATC system. 3. Furnish and install new glycol circulation pumps to replace the existing. The new pumps will be inline circulators and the supply and return piping feeding each pump will need modified from the current orientation feeding the existing base-mounted pumps. 4. Under Add-Alternate H-1 replace all existing pneumatically controlled VAV terminals with new electrically controlled VAVs |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |