Similar Projects
Marlboro Zone Reinforcement Old Marlboro Pike
Infrastructure
Bidding
Upper Marlboro, MD 20772

Task Order 91 Marshall Avenue Water Main Replacement
Infrastructure
Bidding
Laurel, MD 20707

Complete Dry-Barrel Fire Hydrants
Term Contract
Post-Bid
Laurel, MD 20707

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Saint Clair 16 Water Main Replacement
Results
MD

Task Order No. 77 - Riggs Road Water Main Replacement
Post-Bid
$1,000,001 to $2,500,000 est. value
Hyattsville, MD 20780

Patuxent Raw Water Pipeline Phase I and Phase II
Results
Less than $10,488,180 est. value
Laurel, MD 20707

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Largo Road Transmission Water Main Replacement
Results
Laurel, MD 20707

Water Line Installation Fraternity Row
Infrastructure
Post-Bid
$100,000 to $500,000 est. value
College Park, MD 20740

Cherry Hill Water Main Replacement
Results
Laurel, MD 20707

Domestic Water Valve Vault
Infrastructure
Post-Bid
College Park, MD 20742

Maintenance and Repair Services To Pure Water Systems
Results
Beltsville, MD

Veirs Mill Road 30-Inch Water Main Replacement
Infrastructure
Post-Bid
Laurel, MD

Last Updated 01/28/2022 08:19 AM
Project Title

Wheeler Road Water Main Replacement

Physical Address View project details and contacts
City, State (County) Hillcrest Heights, Marlow Heights, MD   (Prince Georges County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,318,354
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing/relocating existing water mains with approximately 3,477 feet of new 16-inch ductile iron pipe in Wheeler Road; 1,106 feet of new 8-inch ductile iron pipe in Iverson Place; 10 feet of new 8-inch ductile iron pipe in Manor Drive; 80 feet of new 16-inch ductile iron pipe in Birchtree Lane; 67 feet of new 8-inch ductile iron pipe in Barnaby Lane; 22 feet of new 6-inch ductile iron pipe in Old Barnaby Road; 81 feet of new 8-inch ductile iron pipe in Abbott Drive; and 72 feet of new 10-inch ductile iron pipe in Owens Road.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 13 - Special Construction.
Division 31 - Earthwork.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents