Similar Projects
Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Rolling Meadows Residential Development
New Construction, Infrastructure
Design
Cottage Grove, MN

2021 CR 81 Grading
Infrastructure
Bidding
Big Lake, MN 55309

Virginia Courthouse Landscape
Post-Bid
Virginia, MN 55792

DNR1 Graceton WMA Brush Mowing
Post-Bid
Graceton, MN

Boulevard and Park Tree Removal
Results
$37,000 to $63,000 est. value
Burnsville, MN

Highway 36 and CSAH 15 Tree Clearing
Results
Stillwater, MN 55082

Springview Meadow Residential Development
New Construction, Infrastructure
Construction
Prior Lake, MN

Eagle Brook Church
Renovation, Infrastructure
Pending Verification
Apple Valley, MN 55124

Amber Fields Development
New Construction, Infrastructure - 100,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN

Tree Services
Post-Bid
Austin, MN

Blue Earth County Judicial Ditch No. 14 Blue Earth County Drainage Authority
Results
Less than $485,000 est. value
Mankato, MN

Region 3 Road Grading 2021
Post-Bid
Saint Paul, MN

2021 Tree and Stump Removal and Disposal
Results
Minneapolis, MN

Road Maintenance
Term Contract
Post-Bid
MN

Reported 08/24/2021 12:00 AM
Project Title

Tree/Brush Trimming and Removal

Physical Address View project details and contacts
City, State (County) Big Lake, MN 55309   (Sherburne County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Contractor shall provide all labor, materials, equipment and supervision to trim the trees and brush within the Township road right of way (R/W). Tree trimming road project shall include the following roads: 1. Area 1: 253 ½ Ave from CR 15 west to 164 ½ St. north to 254 Ave west to 165 St to north to 257 Ave. Trim trees and brush, no trees to be removed. 2. Area 2: 268 Av east of CR 1 to 150 St, 150 St north and south to end of cul de sac. 147 St north and south of 268 Ave to end of cul de sac. Trim trees and brush, no trees to be removed The attached map reflects the roads to have the trees trimmed and brushed. B. In regard to trimming trees along township roads in this project, the road R/W shall be defined as: 1. Approximately 6 feet from the edge of township road surface 2. If an obstruction (retaining wall, fence etc.) is within the 6 feet of the road surface, the obstruction shall be the edge of R/W. C. Trees within this corridor shall be cut off within 1” of the ground. Trees to be removed in the corridor will be marked by Orrock Township. D. With trees outside this corridor with branched that extend into the corridor, trim branches to entire height above the township road. Tree branches extending into this corridor from trees outside the corridor area shall be removed at the corridor boundary unless adjacent property owner gives permission to remove branch at the trunk. E. All branches shall be chipped, hauled and disposed in a proper fashion. Salvageable logs (greater than 6” dia.)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents