Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2021 Plant Mix
Results
Less than $3,868,000 est. value

2021 Plant Mix
Results
Less than $6,395,000 est. value

2021 Plant Mix
Results
Less than $2,400,000 est. value

Annual Contract for In-Place Asphalt Concrete Paving Repairs
Term Contract
Results
VA

2021 Plant Mix
Results
$3,111,000 est. value

Oakleys Lane Realignment Improvement Plans
Results
VA

Path Improvements in the Day Use Area Service Road at Westmoreland Park
Results
Montrose, VA 22520

Richmond South BIMS
Term Contract
Results

Left and Right Turning Lane Addition
Infrastructure
Results
$1,260,000 est. value
VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Annual Contract for Small Capital Improvement Projects
Term Contract, Infrastructure
Results
Less than $500,000 est. value
VA

Church Road Safety Improvements
Infrastructure
Results
Henrico, VA 23233

Last Updated 06/29/2022 06:45 AM
Project Title

Landside Roads Rehabilitation Phase 2

Physical Address View project details and contacts
City, State (County) Richmond, VA 23250   (Henrico County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To resurface and re-stripe approximately 45,000 square yards of asphalt within Commission landside property. Inlaid pavement markers must be installed. Minor grading is required in some areas to remove excess soil buildup and backfill rutting along shoulders. All maintenance of traffic must be performed by the Contractor. The portion of work included with this project is regarded as Phase 2; Phase 1 was completed in 2019.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents