Similar Projects
Last Updated | 08/22/2022 08:32 AM |
Project Title | LUC-CR520-1.76 Jackman Road and Var |
Physical Address | View project details and contacts |
City, State (County) | Toledo, OH 43612 (Lucas County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Roadway Lighting, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Start/Delivery Date Within 10 days of contract award Project Duration 45 Days Bid Valid 90 Days Liquidated Damages $450 for each calendar day of overrun in time (ODOT Spec. 108.07) Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 08/18/2022 1:30 PM (EDT) This project consists of installing a traffic signal at the intersection of Jackman Road and Slater Street for the Chessie Circle Trail crossing as well as updating the pavement markings and pedestrian ramps. Items include signal heads with backplates, pedestrian countdown heads, pushbuttons, poles and mast arms, pedestals, signal cable, controller cabinets, pullboxes, conduit, and video detection. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |