Similar Projects
Ferry Point Marina Wastewater Treatment Plant
New Construction
Conception
$1,500,000 est. value
Trappe, MD

Patapsco Centrate Treatment Facilities - 551-150
Renovation
Conception
$54,473,000 est. value
Baltimore, MD 21226

Princess Anne Wastewater Treatment Plant Enhanced Nutrient Removal Upgrade
Addition
Design
$6,000,000 est. value
Princess Anne, MD

Mattawoman Wastewater Treatment Plant Electrical and Automation Improvements
Alteration
Bidding
$20,000,000 est. value
La Plata, MD 20646

Design and Construct New Gravity Thickener No. 4
New Construction
Bidding
$200,000 est. value
La Plata, MD 20646

Potomac WFP Solids Handling Building Upgrade
Renovation
Post-Bid
$3,000,000 to $6,000,000 est. value
MD

ENR Upgrade to the Twin Cities Wastewater Treatment Plant
Post-Bid
Secretary, MD

Rockville Water Treatment Plant Improvements: Electrical Systems Upgrade and Building Renovations
Renovation
Results
$6,000,000 to $7,000,000 est. value
Potomac, MD 20854

Victor Cullen Center Wastewater Treatment Plant and Collection System Upgrades
Results
Sabillasville, MD 21780

Patapsco Storeroom Modernization - 551-155 - City of Baltimore
Renovation
Conception
$4,204,000 est. value
Baltimore, MD 21226

Stevensville Water Treatment Plant
New Construction
Post-Bid
Stevensville, MD 21666

Mattawoman Water Reclamation Facility Sludge Processing
Results
La Plata, MD 20646

Linganore Water Plant Filters Rehabilitation - 360037 - City of Frederick
Renovation
Conception
$2,000,000 est. value
Frederick, MD 21701

FY22 Water Treatment System Maintenance
Term Contract
Post-Bid
$100,000 to $500,000 est. value
Salisbury, MD

Cliffton Wastewater Treatment Plant Upgrades
Results
Less than $4,615,000 est. value
La Plata, MD

Last Updated 06/23/2022 07:17 AM
Project Title

Twin Cities Wastewater Treatment Plant Upgrade

Physical Address View project details and contacts
City, State (County) Secretary, MD 21664   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Project generally consists of the construction of a new headworks building, raw sewage pumping station, a new two-basin Sequencing Batch Reactor (SBR) process, with aerobic digesters and 24-hour storage/equalization tanks, which is a pre-stressed post tensioned concrete structure, chemical addition facilities, conversion of chlorine contact tanks to a new ultraviolet (UV) disinfection system, a new solids dewatering system, demolition of some existing structures, upgrades to the electrical service and emergency generator set replacement.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents