Similar Projects
Margaret Pollard Expansion - Chatham County
Addition, Demolition, Infrastructure
Conception
$400,000 CJ est. value
Chapel Hill, NC 27516

Blackwood Farm Park - 20037 - Orange County
New Construction, Infrastructure, Renovation
Conception
$775,000 CJ est. value
Hillsborough, NC 27516

ArtsCenter
Renovation, Infrastructure - 17,864 SF
Design
$3,000,000 CJ est. value
Carrboro, NC 27510

Murray Hill at Meadowmont - Buildings 3 and 4
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Chapel Hill, NC 27517

Campus-wide Hardscape and Exterior Lighting Replacement
Infrastructure
Bidding
$1,179,000 CJ est. value
Chapel Hill, NC 27516

Odie Street
Infrastructure
Post-Bid
Hillsborough, NC

West Rosemary Street Office and Apartments
Demolition, New Construction, Infrastructure - 4,034 SF
Post-Bid
$1,500,000 CJ est. value
Chapel Hill, NC 27516

Town-Wide Sidewalk Saw Cutting Project
Infrastructure
Results
$68,762 est. value
Chapel Hill, NC 27516

Nc 49 from Alamance County Line to Nc 86 and Six Secondary Roads
Infrastructure
Results
NC

The 203 Project / Carrboro - BP500 Prequalification
New Construction, Infrastructure
Construction
$26,071,297 CJ est. value
Carrboro, NC 27510

AURA Chapel Hill
New Construction, Infrastructure - 410,947 SF
Construction
$100,000,000 CJ est. value
Chapel Hill, NC 27514

Greensboro Street Mixed-Use Development
New Construction, Infrastructure - 16,186 SF
Pending Verification
$10,000,000 CJ est. value
Carrboro, NC 27510

Residence Inn and Summit Place Townhomes
Addition, New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Chapel Hill, NC 27514

County Recreation Center - CPD03 - Orange County
New Construction, Renovation, Infrastructure
Conception
$13,968,597 CJ est. value
Hillsborough, NC 27278

1200 MLK Redevelopment
Demolition, New Construction, Infrastructure - 111,680 SF
Design
$12,000,000 CJ est. value
Chapel Hill, NC 27514

Last Updated 05/09/2023 02:02 PM
Project Title

Cedar Grove Park, Phase II - 20002 - Orange County

Physical Address View project details and contacts
City, State (County) Hillsborough, NC 27278   (Orange County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2031
Bids Due View project details and contacts
Estimated Value $950,523 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Funding for Phase 2 of the Cedar Grove Park is scheduled in FY 2030-31. The projected cost includes an inflation factor from 2022. The adopted master plan includes the addition of tennis courts, a picnic shelter and additional parking in this Phase II construction. Cedar Grove Park opened in 2008 and currently includes baseball/softball fields, a multi-purpose field, trails, playground, basketball courts, a Little Free Library and other amenities. It is co-located with the Cedar Grove Community Center. Additional fields and tennis courts are features of Phase 2. As of May 9, 2023, this project is included in Orange County's FY 2023-33 Capital Improvement Plan and funding is allotted for construction in FY 2030-31. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents