Similar Projects
CIP - Blue Lake Channel (East) Regional Storm Pond - Storm-21-002 - City of Shakopee
Infrastructure
Conception
$675,000 CJ est. value
Shakopee, MN 55379

2024 Full-Depth Pavement Reconstruction - CIF-24-001 - City of Shakopee
Infrastructure
Conception
$1,525,000 CJ est. value
Shakopee, MN 55379

Minnesota Mash Baseball Facility
New Construction, Infrastructure - 67,768 SF
Design
$15,700,000 CJ est. value
Savage, MN 55378

Minnesota Mash Baseball Facility
New Construction, Infrastructure - 67,768 SF
Design
$15,700,000 CJ est. value
Savage, MN 55378

ISD #720 Shakopee High School and Middle School Tennis Court Resurfacing
Infrastructure
Bidding
$60,000 CJ est. value
Shakopee, MN 55379

2023 Street and Utility Improvement Project
Infrastructure
Bidding
$500,000 CJ est. value
New Prague, MN 56071

B-364(5) Bridge Repair Enamels and Sealers
Renovation, Term Contract, Infrastructure
Post-Bid
$35,000 to $40,000 est. value

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

170th Street Improvement Project
Infrastructure
Results
Prior Lake, MN

CH 83 Reconstruction
Infrastructure
Results
MN

Chase Bank / Savage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Savage, MN 55378

Chase Bank / Savage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Savage, MN 55378

2025 Full-Depth Pavement Reconstruction - CIF-25-001 - City of Shakopee
Infrastructure
Conception
$2,025,000 CJ est. value
Shakopee, MN 55379

Canterbury Park Amphitheater
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Shakopee, MN 55379

Cedar Lake Farm Regional Park Campground
Infrastructure, Renovation
Bidding
$700,000 CJ est. value
New Prague, MN 56071

Last Updated 02/13/2023 02:39 AM
Project Title

TH 169 Pedestrian Bridge Project

Physical Address View project details and contacts
City, State (County) Shakopee, MN 55379   (Scott County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,854,178 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Approximate Major Quantities Include: Clearing and Grubbing 0.5 ACRE Common Excavation 1100 C Y Structural Concrete (1G52/3B52) 630 C Y Bridge Slab Concrete 13,000 S F 3" Bituminous Walk 10,600 S F Ornamental Metal Railing 800 L F Lighting System 1 SYS Seeding 1.5 ACRE The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. Bridge No. 70054. WSB PROJECT NO. 017896-000. SP 7005-138 (TH 169). COMPLETION DATE: August 15, 2023 - All work must be completed. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Andrew Plowman at 612.360.1311 and aplowman@wsbeng.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Andrew Plowman at 612.360.1311 and aplowman@wsbeng.com. SCOPE Provide the MnDOT Grade 300 seven-wire, uncoated, low-relaxation steel strand for prestressed concrete beam construction. Description of Work Assume the responsibility to produce a structure free of cracks, which result from unnecessary heat of hydration during the curing of the mass concrete. This effort consists of temperature control of mass concrete for the purpose of minimizing potential cracking because of excessive temperature differentials due to the heat of hydration in concrete and for limiting the maximum temperature of concrete during the hydration process.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents