Similar Projects
South Bay SDA Church
New Construction - 23,850 SF
Construction
$2,400,000 est. value
Chattanooga, TN 37421

Dogtopia
New Construction, Build-Out - 4,584 SF
Post-Bid
Nashville, TN 37215

Goddard School
New Construction
Post-Bid
Murfreesboro, TN 37129

Head Start Building at Western Heights
New Construction - 22,265 SF
Bidding
$6,000,000 est. value
Knoxville, TN 37921

Grace Baptist Church Children's Center
Renovation - 7,337 SF
Construction
Chattanooga, TN 37421

White Pine Head Start
Renovation
Post-Bid
White Pine, TN 37890

Shady Grove Head Start
Renovation
Post-Bid
Dandridge, TN 37725

Parrottsville Head Start
Renovation
Post-Bid
Parrottsville, TN 37843

East End United Methodist Church
Build-Out
Design
Nashville, TN 37206

Madonna Learning Center
Addition
Pending Verification
Germantown, TN 38138

New Hope Presbyterian Church
New Construction - 10,200 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Chattanooga, TN 37421

Last Updated 07/19/2021 04:18 PM
Project Title

The Church at Sugar Creek - Phase 1

Physical Address View project details and contacts
City, State (County) Humboldt, TN 38343   (Gibson County)
Category(s) Education, Religious/Funeral
Sub-Category(s) Pre-School/Daycare, Religious Facility
Contracting Method Construction Manager to Subcontract.
Project Status All Sub-Bids Received
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Religious Facility, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents