Similar Projects
Gas Regulator Station #15 Replacement
Bidding
Warner Robins, GA

Propane Air Mix Plant Emergency Reserve
Post-Bid
Robins Afb, GA

Renovations To Wastewater Treatment Pond
Post-Bid
Forsyth, GA 31029

Relocate Fuel Farm
Results
Clarkesville, GA

SR 316 at Harbins Road Natural Gas Relocation
Results
Less than $948,610 est. value
Buford, GA

2020 Natural Gas Reliability Upgrades
Post-Bid
Dalton, GA 30721

Natural Gas Pipeline to Serve Belmont S/D
Results
Social Circle, GA

Steel Pipe 6 Foot Expansion - Provide and Deliver
Post-Bid
Cartersville, GA 30120

Natural Gas Pipeline to Serve the Oaks at Alcovy S/D
Results
Social Circle, GA

Metering Infrastructure Equipment And Meters
Post-Bid
Cartersville, GA

High Pressure Gas Main Extension Houston Lake Road
Results
Perry, GA 31069

Natural Gas Main Replacement
Post-Bid
Monroe, GA 30655

Fuel Farm Installation
Results
Less than $159,875 est. value
Woodbury, GA

Jet Fuel Truck Tank/Pump Assembly Removal, Refurbish, and Re-Installation
Post-Bid
Dalton, GA 30720

Gas Main Installation
Results
Commerce, GA 30529

Last Updated 11/11/2020 11:01 AM
Project Title

Natural Gas Pressure Improvement Project

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $758,945
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of installing approximately 9,000 feet of 4 inch PE and 3,600 feet of 6 inch PE, at the locations listed below. Note: These locations and quantities are subject to change but will be of similar scope. This will be a line item bid with a not to exceed total. 1. Hwy 138 - Install approximately 7,500 feet of 4 inch PE main on the North side of Hwy 138 in Walnut Grove from 4130 Hwy 138 to Youth Jersey Road 2. Hwy 20 - Install approximately 1,800 feet of 6 inch PE from Cooper Road to Oak Grove Rd, install approximately 1,500 feet of 4 inch PE from Hwy 20 on the North side of Ozora Rd to Bay Crest Lane 3. Hwy 20 - Install approximately 1,800 feet of 6 inch PE from Maranatha Trail to Sugarloaf Parkway

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents