Similar Projects
Reported 08/07/2020 12:00 AM
Project Title

CNG Bus Storage Addition Project

Physical Address View project details and contacts
City, State (County) Flint, MI 48507   (Genesee County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/20/20
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build Services to include work of all trades for the following Project 4 The MTA Grand Blanc Township Alternative Fuels Facility maintains and operates the CNG fixed route and regional bus fleet. Due to growth of the bus fleet, MTA will need to construct an addition to the CNG Bus Storage Facility.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents