Similar Projects
Karen, Eastern to Mojave
Alteration
Conception
Less than $4,500,000 est. value
Las Vegas, NV 89135

Charleston To Cheyenne Widening - Clark County
Alteration
Conception
$25,000,000 est. value
Las Vegas, NV 89101

GAOA Lamoille Pavement Preservation Phase 2 Project for the Humboldt-Toiyabe National Forest
Alteration
Design
$250,000 to $500,000 est. value
Elko, NV

I-215 Widening - St296 - City Of Henderson
Alteration
Design
$19,000,000 est. value
Henderson, NV 89012

Bike Trail Surface Repair, Lake Mead, Nevada
Infrastructure
Bidding
$400,000 est. value
Boulder City, NV 89005

Harmon Avenue, Pecos Road to Boulder Highway
Infrastructure
Bidding
$13,381,276 to $14,989,832 est. value
Las Vegas, NV

Maryland Parkway Bus Rapid Transit (BRT)
Post-Bid
$160,000,000 to $180,000,000 est. value
Las Vegas, NV

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Chip Seal
Results
$2,200,000 to $2,650,000 est. value
NV

Ravenwood Park Playground: Safety Surface Replacement
Renovation, Demolition
Results
$183,350 to $193,000 est. value
Las Vegas, NV 89147

Nevada Pacific Parkway Extension
New Construction, Infrastructure
Conception
$54,000,000 est. value
Fernley, NV 89408

Tompkins, Koval to Paradise - Clark County
Alteration
Design
$16,000,000 est. value
Paradise, NV 89121

Pavement Maintenance, Carlin Readiness Center
Infrastructure
Bidding
$160,000 est. value
Carlin, NV 89822

Downtown Development Infrastructure Project Phase 1
Infrastructure
Post-Bid
$7,100,000 est. value
West Wendover, NV

UNR - Repair and Resurface Parking Deck at 745 W Moana Lane
Results
Reno, NV 89509

Last Updated 07/19/2022 05:31 AM
Project Title

Rubblize PCCP, Place Stress Relief Course and Plantmix Bituminous Surface with Open Grade

Physical Address View project details and contacts
City, State (County) Winnemucca, NV 89446   (Humboldt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,500,000 to $16,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type: District-3 On westbound I 80 west of Battle Mountain, from the beginning of the PCCP, 1.779 miles east of the trailing edge of I-876, to 3.240 miles east of the HU/LA county line. Contract Cost Range: R31 ($13,500,000.01 to $16,500,000) Funding Type: State County(s): Carson city Location: Westbound I-80, West of Battle Mountain, from the beginning of the PCCP, 1.779 miles East of the trailing edge of I-876, to 3.240 miles East of the Humboldt/Lander County line Rubblize PCCP, place stress relief course and plantmix bituminous surface with open grade Prequalification Required: Y Route(s): IR080-3 Milepost(s): MP HU 54.87 to MP HU 61.38 and MP LA 0.00 to MP LA 3.24 Contract Days: 130 (working) Liquidated Damages: $6,800.00 Project Length: 10.0000 mi Stations: "LW" 100+00.00 P.O.T. - "LW" 614+19.48 P.O.T. NVDOT - Rubblize PCCP, Place Stress Relief Course and Plantmix Bituminous Surface With Open Grade *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (9.2%), WBE (6.9%), DBE (5%)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents