Similar Projects
Chick-Fil-A
New Construction - 4,400 SF
Conception
Annandale, VA 22003

Fairfax Peak Indoor Ski Resort
New Construction - 500,000 SF
Conception
$10,000,000 CJ est. value
Lorton, VA

One Hanover
New Construction, Build-Out, Demolition - 15,000 SF
Design
Fredericksburg, VA 22401

Caesars Entertainment Casino
New Construction - 535,000 SF
Design
$500,000,000 est. value
Danville, VA 24541

Starbucks #60180
Build-Out - 2,509 SF
Bidding
Virginia Beach, VA 23462

Arby's
New Construction - 2,332 SF
Bidding
$1,300,000 est. value
Quinton, VA 23141

Chuck E Cheese #551
Renovation - 12,652 SF
Sub-Bidding
Chesapeake, VA 23321

Wendy's
New Construction - 2,091 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Sterling, VA 20166

Cafeteria And Ahu 40 Replacement
Renovation
Post-Bid
Alexandria, VA 22315

Starbucks at Chartway Arena Renovation
Renovation - 1,672 SF
Results
$244,400 to $450,000 est. value
Norfolk, VA

Renovations to Owens Dining Hall - Pops and Sweets
Renovation - 900 SF
Results
Blacksburg, VA

Liberty Place
New Construction, Build-Out, Demolition - 86,000 SF
Construction
$26,000,000 est. value
Fredericksburg, VA 22401

The Mather
New Construction - 686,435 SF
Construction
$500,000,000 est. value
McLean, VA 22102

One Casino + Resort
New Construction - 100,000 SF
Pending Verification
$565,000,000 est. value
Richmond, VA 23234

Del Taco
New Construction
Pending Verification
Virginia Beach, VA

Reported 06/07/2022 12:01 PM
Project Title

Raising Cane's #637

Physical Address View project details and contacts
City, State (County) Sterling, VA 20166   (Loudoun County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method
Project Status Construction Commenced April 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Food/Beverage Service, 1 Story Above Grade, 3,674 SF New Construction, 1 Drive-thru.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents