Similar Projects
6 and 10 Ton HVAC
Bidding
Bryan, TX 77807

6 and 10 Ton HVAC
Bidding
Bryan, TX 77807

Evans Library Annex Entry HVAC
Post-Bid
College Station, TX 77843

Texas Vet Med Diagnostic Lab Renovation of HVAC
Post-Bid
College Station, TX 77845

CUP HHW Heat Exchanger 004 Replacement
Results
Less than $274,170 est. value
College Station, TX 77843

Cooling Tower Repairs
Results
Bryan, TX 77807

Texas A&M Dunn HVAC Replacement
Construction
College Station, TX 77840

Commercial Heating, Ventelation and Air Conditioning (HVAC) Maintenance and Repair
Term Contract
Post-Bid
Bryan, TX 77803

Weatherization Services, HVAC and Construction
Results
Bryan, TX 77802

HVAC and Mechanical Products
Term Contract
Post-Bid

Wellfield Pump Station Cooling Tower Repairs
Results
Less than $46,825 est. value
College Station, TX 77845

Hhwhhx004 Heat Exchanger Installation
Results
Less than $484,000 est. value
College Station, TX 563555

Installation of Vehicle Exhaust Removal Systems at Fire Stations 1, 2, and 4
Results
Less than $168,700 est. value
College Station, TX 77845

Design Build Services for SECO LoneStar Project
Results
Bryan, TX 77803

Wells Hall HVAC Replacement
Results
College Station, TX 77840

Last Updated 12/06/2019 10:47 AM
Project Title

Re-Insulation of UES Chillers

Physical Address View project details and contacts
City, State (County) College Station, TX 77845   (Brazos County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $23,360
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chillers CHLR003, CHLR004, CHLR005 and CHLR006 are located in the Central Utilities Plant (CUP), 0498 Ireland Street, College Station Texas. The chillers are manufactured by York, 2500 ton capacity, 134A refrigerant, 4160 volt drive, model YKZDZBJ7-DJFS. The chillers have been in service for approximately eleven years. The insulation protecting the chiller evaporator section has degraded over time. The insulation requires removal and replacement. The chillers will be electrically and hydraulically isolated during the insulation replacement process.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents