Similar Projects
Lower Valley Energy Workforce Housing
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Jackson, WY 83001

Lower Valley Energy Workforce Housing
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Jackson, WY 83001

Teton Science School Residential Development Phase I
Demolition, New Construction, Infrastructure
Design
$1,200,000 CJ est. value
Wilson, WY 83014

Teton Science School Residential Development Phase I
Demolition, New Construction, Infrastructure
Design
$1,200,000 CJ est. value
Wilson, WY 83014

Jenny Lake Boat Shuttle Concession Water and Wastewater System Replacements
Infrastructure
Bidding
$1,000,000 CJ est. value
Jenny Lake, WY 83012

RFQ Engineering - Northern South Park Transportation Planning and Design
Infrastructure
Bidding
$500,000 CJ est. value
Jackson, WY 83001

Spring Gulch Road Improvements
Infrastructure
Post-Bid
WY

Teton Village 2022 Street Surfacing Project
Infrastructure
Post-Bid
Teton Village, WY

WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Results
Jackson, Teton Village, WY 83001

Rancher Complete Street Project
Infrastructure
Results
Jackson, WY 83001

East Karns Avenue Multi Residential
New Construction, Infrastructure
Construction
$2,100,000 CJ est. value
Jackson, WY 83001

AMK Ranch Seawall Improvements
Infrastructure
Construction
$496,578 CJ est. value
Moran, WY 83013

Snake River Bridge Replacement - Wyoming Department of Transportation
Infrastructure
Pending Verification
$28,800,000 CJ est. value
Jackson, WY 83001

Snake River Bridge Replacement - Wyoming Department of Transportation
Infrastructure
Pending Verification
$28,800,000 CJ est. value
Jackson, WY 83001

Gregory Lane Complete Street/Drainage - Town of Jackson
Infrastructure
Conception
$1,650,000 CJ est. value
Jackson, WY 83001

Last Updated 06/26/2023 07:10 PM
Project Title

State Highway 122 - Coll Creek to State Line - Teton County

Physical Address View project details and contacts
City, State (County) Jackson, WY 83001   (Teton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected August 2025
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 23, 2023, a consultant has been selected to provide preliminary design. The owner has the option whether to continue with design development with same firm or issue a new RFQ for design. It is anticipated construction could be 2-3 years away. *The closed solicitation has been included below for reference: Teton County (Owner) is seeking a qualified consultant with expertise and experience in design and engineering of wildlife crossings to develop terrestrial organism passage projects for three locations identified by the Teton County Wildlife Crossings Master Plan, adopted in 2018. To date, wildlife crossings in Teton County have been initiated through opportunities on highway reconstruction projects led by the Wyoming Department of Transportation (WYDOT). The County would like to proceed in addressing wildlife vehicle collisions and safety concerns on state highways within our boundaries by moving forward with the development of engineering design plans for specific locations that fall outside of proposed highway reconstruction. This planning process will incorporate interagency cooperation and involvement of private landowners in the siting and design of crossings at priority locations. The plans developed through this process will allow for the development of an accurate estimate of construction costs that will be necessary for applications for federal funds. The County will work with WYDOT to ensure that crossings are designed to specifications that allow for their development independent of a highway reconstruction project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents