Similar Projects
West Street Office and Warehouse Development
New Construction, Infrastructure - 30,000 SF
Design
$11,190,000 CJ est. value
Wichita, KS 67213

Milling and HMA Overlay
Infrastructure
Bidding
$3,000,000 CJ est. value
Valley Center, KS 67147

Milling and HMA Overlay
Infrastructure
Bidding
$3,000,000 CJ est. value
Valley Center, KS 67147

2022 Outsourced Pavement Preservation Program Joint and Crack Seal, Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Wichita, KS 67202

2022 Outsourced Pavement Preservation Program Joint and Crack Seal, Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Wichita, KS 67202

Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

Airfield Paint & Rubber Removal Maintenance - Mcconnell AFB Fy21
Term Contract
Post-Bid
$100,000 to $250,000 est. value
McConnell AFB, KS

Paving of Canyon, Monterey, Monument, Monument Circle and Lynndale
Infrastructure
Results
Wichita, KS

Water Distribution System to serve Firefly Way Addition Phase 5
Infrastructure
Results
Wichita, KS

Riverfront Village
New Construction, Infrastructure - 512,000 SF
Pending Verification
$127,000,000 CJ est. value
Wichita, KS 67202

Riverfront Village
New Construction, Infrastructure - 512,000 SF
Pending Verification
$127,000,000 CJ est. value
Wichita, KS 67202

Haskell Street and Haskell Court - Turkey Creek 4th Addition
Infrastructure
Bidding
$2,000,000 CJ est. value
Wichita, KS 67209

Hoover Road Multi-Use Path Phase 1 (Hoover and Zoo Signalization)
Infrastructure
Post-Bid
Wichita, KS

2021 Pavement Rehabilitation
Infrastructure
Results
Derby, KS

Atlas Aerospace Manufacturing Facility Expansion
New Construction, Infrastructure - 71,000 SF
Pending Verification
$4,600,000 CJ est. value
Wichita, KS 67209

Last Updated 08/10/2022 12:01 AM
Project Title

WM, WDS Phase 1, SWD

Physical Address View project details and contacts
City, State (County) Wichita, KS 67202   (Sedgwick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing Water Main Improvements to serve Abilene Place Addition tied with Water Distribution System to serve Abilene Place Addition - Phase 1 tied with Storm Water Drain #478 to serve Abilene Place Addition tied with Sanitary sewer Improvements to serve Abilene Place Addition A Bid Bond in the Amount of Five Percent (5%) of the Total Bid or an Annual Bid Bond is Required Prior to Bid Opening. See Section 102.3 of the City of Wichita Standard Specifications for Further Information. Bidders Are Advised to Contact the Office of the City Engineer (316-268- 4501) Should They Have Any Questions or Concerns About the Plans, Special or Supplemental Provisions, Minority Status, or the Proper Preparation of the Bid Document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents