Similar Projects
Weatherization Assistance Program
Alteration
Post-Bid
Oakland, MI

Destratification Fans Rec Center Gym
Alteration
Post-Bid
Huntington Woods, MI

Disposable Furnace / Air Filters
Term Contract
Results
Rochester Hills, MI

Design and Construct Makerspace Woodshop Dust and Woodchip Collection System
Alteration
Results
Farmington Hills, MI

Bid Package 22-02: Waterford Schools Kettering Phase 2 Interior and HVAC Upgrades
Alteration
Post-Bid
Waterford, MI

FM Building RTUs Replacement
Alteration
Results
Rochester, MI 48309

FMO Bryant Opticlean Air Scrubber
Alteration
Post-Bid
MI

2022 HVAC Ventilation Duct Cleaning and Sanitizing City Buildings
Alteration
Results
Wixom, MI

Civic Center Campus -Bid Package #1 - HVAC Equipment and Elevator
Alteration
Post-Bid
Madison Heights, MI

2022 HVAC Ventilation Duct Cleaning and Sanitizing City Buildings
Alteration
Results
Wixom, MI

Ionization Contractor
Alteration
Post-Bid
Waterford, MI

2021 Bond Program - Bid Package 02 - Oak Park High School - HVAC Upgrades
Alteration
Results
Oak Park, MI 48237

Fire Station #1 Removal and Installation of Roof Top Units
Renovation, Alteration
Post-Bid
$900,000 est. value
Royal Oak, MI 48067

Mechanical Upgrades Project - BP 34
Alteration
Results
Troy, MI 48083

Auburn Hills DPW Office HVAC Renovations
Alteration
Post-Bid
$200,000 est. value
Auburn Hills, MI 48326

Last Updated 05/11/2023 07:28 PM
Project Title

Boiler Replacement at Lakewood Elementary School, Spring Mills Elementary School and Lakeland High School

Physical Address View project details and contacts
City, State (County) Highland, MI 48357   (Oakland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000319021 Bid Proposals shall be on forms furnished within the Project Manual. Each Bidder shall agree not to withdraw a Bid Proposal for a period of sixty (60) calendar days after date for receipt of bids. The Board reserves the right to reject any or all bids received and to waive any formalities in regard thereto. In addition, the Board reserves the right to evaluate bids on any basis determined by the Board to be in the best interest of the Board and to consider alternate bids if the low bidder(s) do not meet the specifications or are otherwise to be unqualified. The Owner reserves the right to reject any or all Bid Proposals, either in whole or in part, and to waive any informalities and irregularities in the Bid Proposals and in the bidding. Questions are submitted online No Contact Information William Weinrauch 248-972-1000 bweinrauch@tmp-architecture.com

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents