Similar Projects
Amite Solar Project
New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Tangipahoa, LA 70465

West Shore Lake Pontchartrain Site Preparation & Sand Placement Contract # 2
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Ponchatoula, LA 70454

LA 1063: Glendale Dr - US 51 Drainage
Infrastructure
Design
$250,000 CJ est. value
Independence, LA 70443

Rehabilitation of Runway 18/36 project at Hammond Northshore Regional Airport
Infrastructure
Bidding
$509,000 CJ est. value
Hammond, LA 70401

Water System Improvements Phase 2
Infrastructure
Bidding
$560,000 CJ est. value
Amite, LA 70422

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Construction of Landfill Cell 15 Tangipahoa Parish Regional Solid Waste Facility
Infrastructure
Post-Bid
$1,600,000 CJ est. value
Amite, LA 70422

Lee Street Lift Station Improvements
Renovation
Results

D. Vickers Hall Renovations and Addition
Addition, Demolition, Renovation, Infrastructure
Results
$29,810,000 CJ est. value
Hammond, LA 70402

Water System Improvements
Infrastructure
Construction
$1,617,000 CJ est. value
Hammond, LA 70401

Windgate Apartments III
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Hammond, LA 70401

Mably's Place
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Amite, LA 70422

La 22: US 51 - Dunson Rd
Infrastructure
Design
$100,000 CJ est. value
Ponchatoula, LA 70454

Sidewalk Improvements [FY 2023]
Infrastructure
Bidding
$289,570 CJ est. value
Hammond, LA 70401

Southwest Railroad Parking Mall (300 Block)
Infrastructure
Post-Bid
$176,000 CJ est. value
Hammond, LA 70401

Last Updated 04/19/2023 07:09 PM
Project Title

Chevy Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Hammond, LA 70403   (Tangipahoa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $142,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consist of removing the existing 2 Aurora split case pumps and motors. Installing 2 new CR255-1 A-G-A-E-HQQE pumps. Contractor to provide all labor and materials for installation of pumps, pipe fittings and electrician to tie in new pumps to existing booster VFDs. Chevy Well location: 2101 Rue Denise, Hammond LA 70403 1. Remove the existing 2 Aurora split case pumps and motors. 2. Remove all existing ductile iron fittings, excluding (2) two 10" new check valves. 3. Install (2) two CR-255-1 A-G-A-E-HQQE vertical multi stage booster pumps.(Pump data sheet attached to RFP) 4. Tie in new pumps to existing booster VFDs The Contractor shall furnish and pay for a Performance Bond written by a company licensed to do business in Louisiana, and shall be countersigned by a person who is contracted with the surety company or bond issuer as an agent of the company or issuer, and who is licensed as an insurance agent in this state, and who is residing in this state, in an amount equal to the 100% contract amount. The Contractor at all times during the term of the contract shall maintain and pay for property damage and public liability insurance with limits of at least ($1,000,000.00) one million dollars inclusive of bodily injury and property damage for any one occurrence. Prior to commencing work under this contract the Contractor must file with the City a "certificate of insurance" meeting aforementioned requirements with the City of Hammond named insured by added endorsement. All premiums and expense incurred with this insurance shall be paid for by the Contractor. The Contractor shall assume the defense of and indemnify and save harmless the City and its Officers and Agents from all claims relating to work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents