Similar Projects
Well No. 3 Replacement Phase 2
Bidding
Los Lunas, NM

First Street Pond and Wastewater Pump Station
New Construction
Bidding
Grants, NM

Well No. 3 Phase 1
Post-Bid
Tijeras, NM 87059

Diagnose and Repair Water Well for Rural Community of Pine Hill
Post-Bid
Pinehill, NM

Drilling and Developing Replacement Water Well 40
Results
$963,498 est. value
Las Cruces, NM

H--NIIP B3.1 Pump Repairs
Results
Farmington, NM 87401

Pendaries Village Mutual Domestic Water Association - Two Supplemental Water Wells
New Construction
Construction
Rociada, NM

Jenkins Well Abandonment
Post-Bid
Santa Clara Pueblo, NM 87532

Drill/Install New Ground Water Monitoring Well Drilling/Installation of Ground Water Monitoring Well
Results
Thoreau, NM

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Cave - Replace Well Pump
Results
Carlsbad, NM 88220

2020 Well 6 Replacement Project
Post-Bid
Logan, NM 88426

NGWSP 4c-8
Results
$100,000,000 est. value
Shiprock, NM

Construction of Port of Entry Fire Line, Tank, and Booster Pump Station
Post-Bid
Columbus, NM 88029

On Call Well, Pump, Motor, and Maintenance Services
Results
Ruidoso, NM 88345

Reported 04/01/2020 12:00 AM
Project Title

Equip Brandy Well 1, an Existing Well with a Solar Pumping System

Physical Address View project details and contacts
City, State (County) Cuba, NM 87013   (Sandoval County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Brandy Well #1, an existing well with a solar pumping system to include up to two (2) storage tanks water trough and a float box. Work will include installing a photovoltaic (PV) water pump system capable of supplying the specified quantities of water complete with modules, support rack, disconnects, controller, motor/pump unit, related wiring and other items required. The project location is approximately 8.5 miles south of Cuba, NM via highway US550.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents