Similar Projects
US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

SR 410/1.0 miles E of Chinook Pass Summit - Culvert Lining
Infrastructure
Conception
$1,436,000 CJ est. value
Naches, WA 98937

SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Design
$735,000 CJ est. value
Toppenish, WA 98948

SR 241 / Allen Rd Intersection - Intersection Safety
Infrastructure
Design
$677,000 CJ est. value
Sunnyside, WA 98944

North Academic Complex
Demolition, New Construction, Infrastructure - 108,136 SF
Bidding
$79,900,000 CJ est. value
Yakima, WA 98908

Clear Creek and Clear Lake Campground Habitat Restoration
Infrastructure
Bidding
$200,000 CJ est. value
Naches, WA 98937

Dollar General #23747 / Harrah
New Construction, Infrastructure - 12,480 SF
Post-Bid
$2,000,000 CJ est. value
Harrah, WA 98933

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Collection System Improvements - Phase 1
Infrastructure
Results
$1,204,118 CJ est. value
Yakima, WA 98901

Collection System Improvements - Phase 1
Infrastructure
Results
$1,204,118 CJ est. value
Yakima, WA 98901

Heritage University Early Learning Center / Toppenish
New Construction, Infrastructure
Construction
$4,100,000 CJ est. value
Toppenish, WA 98948

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Childrens Village Expansion
Addition, Infrastructure, Renovation - 11,000 SF
Pending Verification
$6,400,000 CJ est. value
Yakima, WA 98902

I-82 / Columbia River Bridge WB - Deck Rehabilitation
Infrastructure, Renovation
Conception
$1,480,000 CJ est. value
Sunnyside, WA 98944

Last Updated 10/01/2023 04:01 AM
Project Title

2023 CIPP DID Rehabilitation

Physical Address View project details and contacts
City, State (County) Yakima, WA 98901   (Yakima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2023 CIPP DID Rehabilitation Construction of approximately 5,500 LF of 8", 10", 12", and 18" cured in place pipe for rehabilitating storm sewer drainage pipe, pipe cleaning, video inspection, storm sewer bypass, and rehabilitation of 11 storm sewer manholes. Each bid or proposal must be accompanied by bond or a certified check, payable to the order of the Treasurer of the City of Yakima for the sum of not less than 5% of said bid or proposal and none will be considered unless accompanied by such deposit, to be forfeited to the City of Yakima in the event the successful bidder shall fail or refuse to enter into a Contract with the City for the making and construction of the aforesaid improvement. The City of Yakima reserves the right to reject any and all bids and to waive technicalities or irregularities, and after careful consideration of all bids and factors involved, make the award to best serve the interests of the City of Yakima.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents